Optimizing DER Placement for Resilient and Collaborative Control Applications

The growing integration of distributed energy resources (DERs) within power systems provides the potential to improve grid resilience through strategic placement and operations. This study explores optimizing DER placement to support flexible and collaborative power grid control applications. A set of placement strategies, based on resilience metrics derived from network topology and enabled by facility location models, is proposed, each tailored to address the unique challenges of energy resource allocation. Two case studies exemplify the practical implications of these approaches, particularly in the contexts of collaborative black start restoration and voltage support, demonstrating how strategic positioning facilitates decentralized, autonomous control. The analyses highlight how such placements mitigate single points of failure and foster a robust, distributed infrastructure, underscoring the role of DERs in strengthening grid resilience.

Authors

Institutions

Publication Details

Published
2025-02-10
DOI
https://doi.org/10.1109/tpec63981.2025.10907146
Citations
1
Primary Topic
Fault Detection and Control Systems
Type
article
Field-Weighted Citation Impact
1.21

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing DER Placement for Resilient and Collaborative Control Applications

Y. Lee, Cecilia Klauber, Melek Ben-Ayed
1 citations
Fault Detection and Control Systems
1.21
article

Optimizing DER Placement for Resilient and Collaborative Control Applications

Y. Lee, Cecilia Klauber, Melek Ben-Ayed
article en
1 citations

Abstract

The growing integration of distributed energy resources (DERs) within power systems provides the potential to improve grid resilience through strategic placement and operations. This study explores optimizing DER placement to support flexible and collaborative power grid control applications. A set of placement strategies, based on resilience metrics derived from network topology and enabled by facility location models, is proposed, each tailored to address the unique challenges of energy resource allocation. Two case studies exemplify the practical implications of these approaches, particularly in the contexts of collaborative black start restoration and voltage support, demonstrating how strategic positioning facilitates decentralized, autonomous control. The analyses highlight how such placements mitigate single points of failure and foster a robust, distributed infrastructure, underscoring the role of DERs in strengthening grid resilience.

Lawrence Livermore National Laboratory (US)
U.S. Department of Energy, Lawrence Livermore National Laboratory
Climate action
Openalex Percentile: Top 24%
Fault Detection and Control Systems
1.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.