An exact and heuristic framework for rolling stock rescheduling with railway infrastructure availability constraints

Disruptions on the railway network can lead to reduced availability of the railway infrastructure, which requires rolling stock dispatchers to adjust the planning of the rolling stock. In this paper, we develop fast rolling stock rescheduling methods which ensure feasibility with respect to the availability of the railway infrastructure. In particular, we explore the option of performing shunting movements at stations where shunting does not take place in current practice, due to the large number of trains that pass through or due to the complexity of the station layout. We introduce an exact rolling stock rescheduling algorithm and an iterative heuristic, which alternate between two mathematical formulations, namely one that creates an interim rolling stock schedule and one that tries to fit the suggested shunting movements between the remaining railway traffic. We test our solution approach with instances that contain complete railway blockages on the Dutch railway network. We successfully identify feasible shunting movements and find an average improvement in the objective function of 19% over the rolling stock schedule that would be obtained if performing shunting movements at the considered stations is prohibited. • We consider rolling stock rescheduling with infrastructure availability constraints. • We develop an exact method which resembles a Combinatorial Benders’ approach. • We develop an iterative heuristic which alternates between two MIP formulations. • Computational experiments based on real-life instances from Netherlands Railways.

Authors

Institutions

Publication Details

Journal
Transportation Research Part B Methodological
Published
2025-03-06
DOI
https://doi.org/10.1016/j.trb.2025.103189
Citations
3
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
3.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An exact and heuristic framework for rolling stock rescheduling with railway infrastructure availability constraints

Dennis Huisman, Twan Dollevoet, Jianping Zhu
3 citations
Transportation Research Part B Methodological
Railway Systems and Energy Efficiency
3.73
article

An exact and heuristic framework for rolling stock rescheduling with railway infrastructure availability constraints

Dennis Huisman, Twan Dollevoet, Jianping Zhu
article en
3 citations

Abstract

Disruptions on the railway network can lead to reduced availability of the railway infrastructure, which requires rolling stock dispatchers to adjust the planning of the rolling stock. In this paper, we develop fast rolling stock rescheduling methods which ensure feasibility with respect to the availability of the railway infrastructure. In particular, we explore the option of performing shunting movements at stations where shunting does not take place in current practice, due to the large number of trains that pass through or due to the complexity of the station layout. We introduce an exact rolling stock rescheduling algorithm and an iterative heuristic, which alternate between two mathematical formulations, namely one that creates an interim rolling stock schedule and one that tries to fit the suggested shunting movements between the remaining railway traffic. We test our solution approach with instances that contain complete railway blockages on the Dutch railway network. We successfully identify feasible shunting movements and find an average improvement in the objective function of 19% over the rolling stock schedule that would be obtained if performing shunting movements at the considered stations is prohibited. • We consider rolling stock rescheduling with infrastructure availability constraints. • We develop an exact method which resembles a Combinatorial Benders’ approach. • We develop an iterative heuristic which alternates between two MIP formulations. • Computational experiments based on real-life instances from Netherlands Railways.

Transportation Research Part B MethodologicalVol. 195
Nederlandse Spoorwegen (NL), Erasmus University Rotterdam (NL)
Industry, innovation and infrastructure
Openalex Percentile: Top 8%
Railway Systems and Energy Efficiency
3.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An exact and heuristic framework for rolling stock rescheduling with railway infrastructure availability constraints — Dennis Huisman, Twan Dollevoet, et al. · Transportation Research Part B Methodological (2025) | TGRS Research Map | TGRS