Percepatan Proyek pada Schedule Penjadwalan Kapal Perang dengan Precedence Diagram Method di Perusahaan Galangan Kapal Surabaya

The Shipyard Company is a company that operates in the shipping sector, including ship production, overhaul and ship maintenance. In this case, the Shipbuilding Company has an important role in providing quality and timeliness in every project that has been accepted. Quality and timeliness are closely related to the planned production schedule, with efficient and effective scheduling it will have an impact on the quality results and production progress carried out, and cut excess production costs. Based on these needs, an analysis was carried out using the Precedence Diagram Method (PDM) on the Install Machinery Engine Deck 1 sub-job on the Warship project. The data needed in this research is the work breakdown structure (WBS). Based on the analysis that has been carried out, it was found that the most efficient path was found by eliminating dummy factors, so that work can be carried out simultaneously without waiting for previous work. In this case, it was found that the processing time for the Install Machinery Engine Deck 1 work on the Warship project was 471 days, compared to 657 days previously. Thus, the conclusion of this research is that the PDM method schedule has more efficient results than previous planning.

Authors

Institutions

Publication Details

Journal
Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan Informatika
Published
2025-02-19
DOI
https://doi.org/10.61132/jupiter.v3i2.766
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Percepatan Proyek pada Schedule Penjadwalan Kapal Perang dengan Precedence Diagram Method di Perusahaan Galangan Kapal Surabaya

Deflin Riendra Pratama, Minto Waluyo
Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan Informatika
Management and Optimization Techniques
article

Percepatan Proyek pada Schedule Penjadwalan Kapal Perang dengan Precedence Diagram Method di Perusahaan Galangan Kapal Surabaya

Deflin Riendra Pratama, Minto Waluyo
article en

Abstract

The Shipyard Company is a company that operates in the shipping sector, including ship production, overhaul and ship maintenance. In this case, the Shipbuilding Company has an important role in providing quality and timeliness in every project that has been accepted. Quality and timeliness are closely related to the planned production schedule, with efficient and effective scheduling it will have an impact on the quality results and production progress carried out, and cut excess production costs. Based on these needs, an analysis was carried out using the Precedence Diagram Method (PDM) on the Install Machinery Engine Deck 1 sub-job on the Warship project. The data needed in this research is the work breakdown structure (WBS). Based on the analysis that has been carried out, it was found that the most efficient path was found by eliminating dummy factors, so that work can be carried out simultaneously without waiting for previous work. In this case, it was found that the processing time for the Install Machinery Engine Deck 1 work on the Warship project was 471 days, compared to 657 days previously. Thus, the conclusion of this research is that the PDM method schedule has more efficient results than previous planning.

Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan InformatikaVol. 3(2)
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Openalex Percentile: Top 95%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.