The Risk of Implementing Green Retrofitting in High-Rise Buildings Based on Work Breakdown Structures to Improve Quality of Resource Planning and Cost Accuracy

The building sector accounts for more than one-third of final energy consumption worldwide. Green retrofitting, which is part of the green building activities, is one of the main factors in achieving the target of zero carbon emissions by 2060. Green retrofitting is a viable way to reduce greenhouse gas (GHG) emissions and energy consumption. The risks in green retrofitting work activities have not been studied much, even though the risks in green retrofitting projects are likely to be greater and more complex than the risks in conventional projects. This is reflected in the small application of customization in developing countries, one of which is Indonesia. Through the calculation of the risk matrix between probability and impact, a high risk was obtained from the relationship between risk and correlated resources, and it had a positive impact on the work breakdown structure (WBS). The results obtained show that complexity factors consisting of labor, materials, equipment, work activities, work methods, and scope/work package affect the success of the project, then the risk handling strategy that needs to be implemented is to set the right priorities. A focused project team allocates resources wisely. Knowing the probability of events and impacts arising from the non-implementation of the WBS, we identified sources of risk factors and high risk in the implementation of green retrofitting work based on the WBS based on the Greenship Existing Building Rating Tools and PUPR RI Regulation Number 21 of 2021 applicable in Indonesia, its effect on resource planning, and cost accuracy.

Authors

Institutions

Publication Details

Published
2025-02-28
DOI
https://doi.org/10.3390/engproc2025084074
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Risk of Implementing Green Retrofitting in High-Rise Buildings Based on Work Breakdown Structures to Improve Quality of Resource Planning and Cost Accuracy

Yusuf Latief, Bernadette Detty Kussumardianadewi, Ayomi Dita Rarasati, Muhammad Arkan Akhyari et al.
BIM and Construction Integration
article

The Risk of Implementing Green Retrofitting in High-Rise Buildings Based on Work Breakdown Structures to Improve Quality of Resource Planning and Cost Accuracy

Yusuf Latief, Bernadette Detty Kussumardianadewi, Ayomi Dita Rarasati, Muhammad Arkan Akhyari, Muhammad Faizurrahman
article en

Abstract

The building sector accounts for more than one-third of final energy consumption worldwide. Green retrofitting, which is part of the green building activities, is one of the main factors in achieving the target of zero carbon emissions by 2060. Green retrofitting is a viable way to reduce greenhouse gas (GHG) emissions and energy consumption. The risks in green retrofitting work activities have not been studied much, even though the risks in green retrofitting projects are likely to be greater and more complex than the risks in conventional projects. This is reflected in the small application of customization in developing countries, one of which is Indonesia. Through the calculation of the risk matrix between probability and impact, a high risk was obtained from the relationship between risk and correlated resources, and it had a positive impact on the work breakdown structure (WBS). The results obtained show that complexity factors consisting of labor, materials, equipment, work activities, work methods, and scope/work package affect the success of the project, then the risk handling strategy that needs to be implemented is to set the right priorities. A focused project team allocates resources wisely. Knowing the probability of events and impacts arising from the non-implementation of the WBS, we identified sources of risk factors and high risk in the implementation of green retrofitting work based on the WBS based on the Greenship Existing Building Rating Tools and PUPR RI Regulation Number 21 of 2021 applicable in Indonesia, its effect on resource planning, and cost accuracy.

University of Indonesia (ID)
Decent work and economic growth
Openalex Percentile: Top 96%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Risk of Implementing Green Retrofitting in High-Rise Buildings Based on Work Breakdown Structures to Improve Quality of Resource Planning and Cost Accuracy — Yusuf Latief, Bernadette Detty Kussumardianadewi, et al. · (2025) | TGRS Research Map | TGRS