Intelligent Control of Engineering Costs During the Construction Phase of Grid Construction Projects Considering Response Costs

This paper an intelligent cost control method for the construction phase of power grid construction projects is designed to consider the response cost. The project scale, construction difficulty, material price fluctuation, labor cost changes and other indicators are taken into account to determine the scope of intelligent control limits of project cost in the construction phase of grid construction projects. It identifies risk factors such as engineering changes, material price increase, construction delay, and substandard quality, and evaluates the risk of cost control in the construction phase of grid construction projects. Based on the response cost to control the load in the construction phase of grid construction projects, the cost of electricity consumption is adjusted according to the demand response of grid construction, and the cost of electricity consumption is eliminated or shifted, so as to achieve the purpose of accurate control of project cost. The analysis of examples verifies that this method has better cost control effect and can be applied in real life.

Authors

Institutions

Publication Details

Published
2024-12-06
DOI
https://doi.org/10.1109/icips64173.2024.10900020
Citations
1
Primary Topic
Industrial Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent Control of Engineering Costs During the Construction Phase of Grid Construction Projects Considering Response Costs

Kailing Chen, Songfeng Shi
1 citations
Industrial Engineering and Technologies
0.21
article

Intelligent Control of Engineering Costs During the Construction Phase of Grid Construction Projects Considering Response Costs

Kailing Chen, Songfeng Shi
article en
1 citations

Abstract

This paper an intelligent cost control method for the construction phase of power grid construction projects is designed to consider the response cost. The project scale, construction difficulty, material price fluctuation, labor cost changes and other indicators are taken into account to determine the scope of intelligent control limits of project cost in the construction phase of grid construction projects. It identifies risk factors such as engineering changes, material price increase, construction delay, and substandard quality, and evaluates the risk of cost control in the construction phase of grid construction projects. Based on the response cost to control the load in the construction phase of grid construction projects, the cost of electricity consumption is adjusted according to the demand response of grid construction, and the cost of electricity consumption is eliminated or shifted, so as to achieve the purpose of accurate control of project cost. The analysis of examples verifies that this method has better cost control effect and can be applied in real life.

Shanghai Electric (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 48%
Industrial Engineering and Technologies
0.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Intelligent Control of Engineering Costs During the Construction Phase of Grid Construction Projects Considering Response Costs — Kailing Chen, Songfeng Shi · (2024) | TGRS Research Map | TGRS