An Aerospace Equipment Operation and Maintenance Scheduling Method Based on LLM and Solver

In this paper, an integrated management approach was proposed for aerospace equipment maintenance based on large language models (LLMs) and optimization solvers, aiming to improve the efficiency and convenience of maintenance decision support. A dataset tailored to maintenance scenarios in the aerospace domain was constructed, and the GLM4-9B model was fine-tuned using the LoRA method to accurately understand and invoke maintenance task instructions. Combining the OR-Tools optimization solver, a two-stage algorithm was designed to optimize maintenance resource allocation and vehicle routing. On this basis, a prototype system for integrated maintenance management based on LLMs and optimization solvers is implemented, validating the effectiveness of the proposed approach. The proposed method was demonstrated by experimental results to significantly improve the accuracy and efficiency of maintenance decision-making in the aerospace domain, offering new insights for aerospace equipment maintenance management.

Authors

Institutions

Publication Details

Published
2024-12-27
DOI
https://doi.org/10.1109/icairc64177.2024.10899990
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Aerospace Equipment Operation and Maintenance Scheduling Method Based on LLM and Solver

Linxuan Zhang, Tian Xia, Hao Wang, Tianyue Wang
Reliability and Maintenance Optimization
article

An Aerospace Equipment Operation and Maintenance Scheduling Method Based on LLM and Solver

Linxuan Zhang, Tian Xia, Hao Wang, Tianyue Wang
article en

Abstract

In this paper, an integrated management approach was proposed for aerospace equipment maintenance based on large language models (LLMs) and optimization solvers, aiming to improve the efficiency and convenience of maintenance decision support. A dataset tailored to maintenance scenarios in the aerospace domain was constructed, and the GLM4-9B model was fine-tuned using the LoRA method to accurately understand and invoke maintenance task instructions. Combining the OR-Tools optimization solver, a two-stage algorithm was designed to optimize maintenance resource allocation and vehicle routing. On this basis, a prototype system for integrated maintenance management based on LLMs and optimization solvers is implemented, validating the effectiveness of the proposed approach. The proposed method was demonstrated by experimental results to significantly improve the accuracy and efficiency of maintenance decision-making in the aerospace domain, offering new insights for aerospace equipment maintenance management.

China Aerospace Science and Technology Corporation (CN), Tsinghua University (CN)
Innovation Fund
Openalex Percentile: Top 66%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.