Optimization on room height of 220 kV GIS distribution equipment considering double-break bus disconnector

With the maturity of production technology and the improvement of manufacturing process, on the one hand, combined electrical appliances continue to develop towards integration and miniaturization; On the other hand, without considering the requirement of non-power outage expansion in the long-term expansion of substation, the combinator configured with double-break busbar isolation switch has been more widely used in the power grid. In order to further improve the space utilization rate of substation and reduce the investment and construction cost of substation, the control of the building height is an effective means. Based on the investigation of the dimensions, installation, expansion, testing, operation and maintenance of the combined electrical equipment, this paper puts forward the optimization scheme of the height of 220 kV GIS (Gas Insulation Switch) distribution unit room. Combined with the actual project of certain 500kV substation, the optimization scheme of 220 kV GIS distribution unit room is applied.

Authors

Publication Details

Published
2024-12-06
DOI
https://doi.org/10.1109/icips64173.2024.10900160
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization on room height of 220 kV GIS distribution equipment considering double-break bus disconnector

Yu Zheng, Yong Luo, Fei Wang, Qing Qin et al.
Power Systems and Technologies
article

Optimization on room height of 220 kV GIS distribution equipment considering double-break bus disconnector

Yu Zheng, Yong Luo, Fei Wang, Qing Qin, Qian Wu, Xiaobo Liu
article en

Abstract

With the maturity of production technology and the improvement of manufacturing process, on the one hand, combined electrical appliances continue to develop towards integration and miniaturization; On the other hand, without considering the requirement of non-power outage expansion in the long-term expansion of substation, the combinator configured with double-break busbar isolation switch has been more widely used in the power grid. In order to further improve the space utilization rate of substation and reduce the investment and construction cost of substation, the control of the building height is an effective means. Based on the investigation of the dimensions, installation, expansion, testing, operation and maintenance of the combined electrical equipment, this paper puts forward the optimization scheme of the height of 220 kV GIS (Gas Insulation Switch) distribution unit room. Combined with the actual project of certain 500kV substation, the optimization scheme of 220 kV GIS distribution unit room is applied.

Affordable and clean energy
Openalex Percentile: Top 74%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.