Analysis and modeling of delays during construction handover stage for building projects: a case study of United Arab Emirates

Purpose This research aims to identify, rank and evaluate the impact of delay factors on the timely completion of the handover stage of construction projects in the United Arab Emirates (UAE). Design/methodology/approach The study was conducted in two stages. Initially, an extensive literature review and focus groups with industry professionals were utilized to identify and rank delay factors specific to the UAE’s construction sector. Second, data were collected from multiple construction firms in the UAE, and a delay estimation model was developed and subsequently validated. Findings A total of 30 delay factors were identified and ranked according to their significance index values. The top five factors were linked to various stakeholders, including subcontractors, general contractors, customers and project owners. The developed model demonstrated an accuracy of 71% on the test dataset. Research limitations/implications While the model shows promising results, its accuracy could be further enhanced with additional data or through the exploration of more advanced nonlinear predictive models. Practical implications The findings can assist various construction project stakeholders to better manage and mitigate delays, potentially leading to more successful project completions. Social implications Improving the efficiency of the handover process can lead to faster project completions, which in turn can reduce the social inconvenience caused by prolonged construction activities. Originality/value The study is novel in focusing specifically on the UAE and Gulf region, where previous research is limited. The development and validation of a delay estimation model tailored to this regional context enhances the originality of the research.

Authors

Institutions

Publication Details

Journal
International Journal of Building Pathology and Adaptation
Published
2025-03-04
DOI
https://doi.org/10.1108/ijbpa-05-2024-0096
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis and modeling of delays during construction handover stage for building projects: a case study of United Arab Emirates

Fatma Hosny, Saleh Abu Dabous, Bharadwaj R. K. Mantha, Mohamed El-Damaty
1 citations
International Journal of Building Pathology and Adaptation
Construction Project Management and Performance
2.11
article

Analysis and modeling of delays during construction handover stage for building projects: a case study of United Arab Emirates

Fatma Hosny, Saleh Abu Dabous, Bharadwaj R. K. Mantha, Mohamed El-Damaty
article en
1 citations

Abstract

Purpose This research aims to identify, rank and evaluate the impact of delay factors on the timely completion of the handover stage of construction projects in the United Arab Emirates (UAE). Design/methodology/approach The study was conducted in two stages. Initially, an extensive literature review and focus groups with industry professionals were utilized to identify and rank delay factors specific to the UAE’s construction sector. Second, data were collected from multiple construction firms in the UAE, and a delay estimation model was developed and subsequently validated. Findings A total of 30 delay factors were identified and ranked according to their significance index values. The top five factors were linked to various stakeholders, including subcontractors, general contractors, customers and project owners. The developed model demonstrated an accuracy of 71% on the test dataset. Research limitations/implications While the model shows promising results, its accuracy could be further enhanced with additional data or through the exploration of more advanced nonlinear predictive models. Practical implications The findings can assist various construction project stakeholders to better manage and mitigate delays, potentially leading to more successful project completions. Social implications Improving the efficiency of the handover process can lead to faster project completions, which in turn can reduce the social inconvenience caused by prolonged construction activities. Originality/value The study is novel in focusing specifically on the UAE and Gulf region, where previous research is limited. The development and validation of a delay estimation model tailored to this regional context enhances the originality of the research.

International Journal of Building Pathology and AdaptationVol. 44(3)
University of Sharjah (AE)
Openalex Percentile: Top 16%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis and modeling of delays during construction handover stage for building projects: a case study of United Arab Emirates — Fatma Hosny, Saleh Abu Dabous, et al. · International Journal of Building Pathology and Adaptation (2025) | TGRS Research Map | TGRS