Perencanaan Fleet dalam Produksi Pengangkutan Overburden Berdasarkan Data Cycle Time dengan Menggunakan Metode Monte Carlo di PT Pancaran Surya Abadi, Kecamatan Muara Badak, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur.

Abstract. This research was conducted at PT Pancaran Surya Abadi, a coal mining company in East Kalimantan, to plan the fleet for overburden transportation using the Monte Carlo method. The objective is to determine the optimal fleet size, maximize production, and estimate the expected probability value of production. The study found production shortfalls caused by technical and non-technical factors. The efficiency values of equipment such as excavators and dump trucks were analyzed, yielding significant productivity results. Simulations using the Monte Carlo method showed that with probability values of 50%, 70%, and 100%, the equipment compatibility factor exceeded 1, indicating that production targets were met. The actual compatibility value obtained was 0.99. Abstrak. Penelitian ini dilakukan di PT Pancaran Surya Abadi, sebuah perusahaan pertambangan batubara di Kalimantan Timur, untuk merencanakan fleet pengangkutan overburden menggunakan metode Monte Carlo. Tujuannya adalah untuk menentukan jumlah fleet yang optimal, memaksimalkan produksi, dan memperkirakan nilai harapan probabilitas produksi. Penelitian menemukan ketidaktercapaian produksi yang disebabkan oleh faktor teknis dan non-teknis. Nilai efisiensi kerja alat seperti excavator dan dump truck dianalisis, dengan hasil produktivitas yang signifikan. Simulasi menggunakan metode Monte Carlo menunjukkan bahwa dengan nilai probabilitas 50%, 70%, dan 100%, faktor keserasian alat mencapai nilai lebih dari 1, sehingga produksi tercapai. Nilai keserasian alat aktual yang didapatkan adalah 0,99.

Authors

Institutions

Publication Details

Journal
Bandung Conference Series Mining Engineering
Published
2025-02-03
DOI
https://doi.org/10.29313/bcsme.v5i1.17541
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Fleet dalam Produksi Pengangkutan Overburden Berdasarkan Data Cycle Time dengan Menggunakan Metode Monte Carlo di PT Pancaran Surya Abadi, Kecamatan Muara Badak, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur.

Noor Fauzi Isniarno, Muhammad Hafizh Anshari, Rully Nurhasan Ramadani
Bandung Conference Series Mining Engineering
Management and Optimization Techniques
article

Perencanaan Fleet dalam Produksi Pengangkutan Overburden Berdasarkan Data Cycle Time dengan Menggunakan Metode Monte Carlo di PT Pancaran Surya Abadi, Kecamatan Muara Badak, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur.

Noor Fauzi Isniarno, Muhammad Hafizh Anshari, Rully Nurhasan Ramadani
article en

Abstract

Abstract. This research was conducted at PT Pancaran Surya Abadi, a coal mining company in East Kalimantan, to plan the fleet for overburden transportation using the Monte Carlo method. The objective is to determine the optimal fleet size, maximize production, and estimate the expected probability value of production. The study found production shortfalls caused by technical and non-technical factors. The efficiency values of equipment such as excavators and dump trucks were analyzed, yielding significant productivity results. Simulations using the Monte Carlo method showed that with probability values of 50%, 70%, and 100%, the equipment compatibility factor exceeded 1, indicating that production targets were met. The actual compatibility value obtained was 0.99. Abstrak. Penelitian ini dilakukan di PT Pancaran Surya Abadi, sebuah perusahaan pertambangan batubara di Kalimantan Timur, untuk merencanakan fleet pengangkutan overburden menggunakan metode Monte Carlo. Tujuannya adalah untuk menentukan jumlah fleet yang optimal, memaksimalkan produksi, dan memperkirakan nilai harapan probabilitas produksi. Penelitian menemukan ketidaktercapaian produksi yang disebabkan oleh faktor teknis dan non-teknis. Nilai efisiensi kerja alat seperti excavator dan dump truck dianalisis, dengan hasil produktivitas yang signifikan. Simulasi menggunakan metode Monte Carlo menunjukkan bahwa dengan nilai probabilitas 50%, 70%, dan 100%, faktor keserasian alat mencapai nilai lebih dari 1, sehingga produksi tercapai. Nilai keserasian alat aktual yang didapatkan adalah 0,99.

Bandung Conference Series Mining EngineeringVol. 5(1)
Bandung Islamic University (ID)
Openalex Percentile: Top 95%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.