Intelligent Processing of Design Notices in Engineering Procurement Construction Projects

The accumulation and delayed processing of notices generated during the engineering construction process have a significant impact on project settlement and, thus, project cost. Currently, there is a lack of research on intelligent notice processing. Although large language models (LLMs), such as ChatGPT, have demonstrated exceptional performance in natural language processing, their effectiveness in specific vertical fields, such as construction engineering, is limited due to a lack of specialized training. In light of this, this study proposes a knowledge-augmented language model for intelligently processing design notices in EPC (engineering–procurement–construction) projects. This method consists of the following three key components: database construction, price retrieval, and prompt development. During database construction, exception detection was introduced to ensure data quality, and an appropriate database framework was proposed. The price retrieval module features innovative retrieval rules for improved efficiency and accuracy. Prompt development was based on mainstream methods, which were tailored for this task. The result of processing notices includes cost analysis and claimability judgement. The method achieved promising results in experiments with real project data. Based on these results, the paper discusses the model’s advantages, application scenarios, and input text requirements, providing insights and suggestions for future research.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-03-02
DOI
https://doi.org/10.3390/buildings15050805
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
2.01

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent Processing of Design Notices in Engineering Procurement Construction Projects

Ling Zhang, Zhiqi Chen, Xing Su
2 citations
Buildings
BIM and Construction Integration
2.01
article

Intelligent Processing of Design Notices in Engineering Procurement Construction Projects

Ling Zhang, Zhiqi Chen, Xing Su
article en
2 citations

Abstract

The accumulation and delayed processing of notices generated during the engineering construction process have a significant impact on project settlement and, thus, project cost. Currently, there is a lack of research on intelligent notice processing. Although large language models (LLMs), such as ChatGPT, have demonstrated exceptional performance in natural language processing, their effectiveness in specific vertical fields, such as construction engineering, is limited due to a lack of specialized training. In light of this, this study proposes a knowledge-augmented language model for intelligently processing design notices in EPC (engineering–procurement–construction) projects. This method consists of the following three key components: database construction, price retrieval, and prompt development. During database construction, exception detection was introduced to ensure data quality, and an appropriate database framework was proposed. The price retrieval module features innovative retrieval rules for improved efficiency and accuracy. Prompt development was based on mainstream methods, which were tailored for this task. The result of processing notices includes cost analysis and claimability judgement. The method achieved promising results in experiments with real project data. Based on these results, the paper discusses the model’s advantages, application scenarios, and input text requirements, providing insights and suggestions for future research.

BuildingsVol. 15(5)
Zhejiang Province Institute of Architectural Design and Research (CN), Zhejiang University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 16%
BIM and Construction Integration
2.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Intelligent Processing of Design Notices in Engineering Procurement Construction Projects — Ling Zhang, Zhiqi Chen, et al. · Buildings (2025) | TGRS Research Map | TGRS