Robust Optimization Method of Industrial Park Microgrid Based on Data-driven

In order to accurately describe the impact of the fluctuation and randomness of new energy output power on the operation of industrial park microgrid systems, a data-driven robust optimization method for industrial park microgrid is proposed. Firstly, based on the traditional interval set, the uncertain parameters of new energy output are modeled using a polyhedral set. Then, an ellipsoidal uncertainty set is established using historical data of new energy output with spatiotemporal correlation. By connecting high-dimensional ellipsoidal vertices, a data-driven convex hull polyhedron set is established. Then, the uncertain parameters are better enveloped by scaling the convex hull set. A data-driven robust optimization model for industrial park microgrid was further established, and the C&CG was used to solve the model. Finally, simulation comparisons were conducted through examples, and the results showed that the data-driven robust optimization method for industrial park microgrid can reduce conservatism and improve the robustness of optimization results, demonstrating the effectiveness of the proposed method.

Authors

Institutions

Publication Details

Published
2024-12-29
DOI
https://doi.org/10.1109/iceace63551.2024.10898373
Primary Topic
Advanced Technologies in Various Fields
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Robust Optimization Method of Industrial Park Microgrid Based on Data-driven

Dongjing Xie, Junda Zhang, Bingyan Jiang, Chuanhong Ru
Advanced Technologies in Various Fields
article

Robust Optimization Method of Industrial Park Microgrid Based on Data-driven

Dongjing Xie, Junda Zhang, Bingyan Jiang, Chuanhong Ru
article en

Abstract

In order to accurately describe the impact of the fluctuation and randomness of new energy output power on the operation of industrial park microgrid systems, a data-driven robust optimization method for industrial park microgrid is proposed. Firstly, based on the traditional interval set, the uncertain parameters of new energy output are modeled using a polyhedral set. Then, an ellipsoidal uncertainty set is established using historical data of new energy output with spatiotemporal correlation. By connecting high-dimensional ellipsoidal vertices, a data-driven convex hull polyhedron set is established. Then, the uncertain parameters are better enveloped by scaling the convex hull set. A data-driven robust optimization model for industrial park microgrid was further established, and the C&CG was used to solve the model. Finally, simulation comparisons were conducted through examples, and the results showed that the data-driven robust optimization method for industrial park microgrid can reduce conservatism and improve the robustness of optimization results, demonstrating the effectiveness of the proposed method.

Zhejiang Energy Group (China) (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 75%
Advanced Technologies in Various Fields
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Robust Optimization Method of Industrial Park Microgrid Based on Data-driven — Dongjing Xie, Junda Zhang, et al. · (2024) | TGRS Research Map | TGRS