Penalty for withdrawal of work in public works contracts : A comparative study

  One of the key administrative sanctions available to the administration is the ability to pressure a negligent contractor in cases of serious error or default, compelling them to fulfill their contractual obligations without resorting to the judiciary. This power, often based on contractual provisions or legal authorization, allows the administration to carry out the work at the contractor’s expense to ensure the uninterrupted operation of public facilities and serve the public interest. However, this discretionary authority is not absolute and must not infringe upon the contractor’s rights. To prevent administrative arbitrariness, legal safeguards have been established, including granting the contractor the right to present a defense before penalties are imposed and subjecting the penalty decision to judicial review for legality and appropriateness. 

Authors

Institutions

Publication Details

Journal
الرافدین للحقوق
Published
2025-03-01
DOI
https://doi.org/10.33899/alaw.2021.129362.1126
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Penalty for withdrawal of work in public works contracts : A comparative study

فواز المختار, قیدار صالح
الرافدین للحقوق
Construction Project Management and Performance
article

Penalty for withdrawal of work in public works contracts : A comparative study

فواز المختار, قیدار صالح
article en

Abstract

  One of the key administrative sanctions available to the administration is the ability to pressure a negligent contractor in cases of serious error or default, compelling them to fulfill their contractual obligations without resorting to the judiciary. This power, often based on contractual provisions or legal authorization, allows the administration to carry out the work at the contractor’s expense to ensure the uninterrupted operation of public facilities and serve the public interest. However, this discretionary authority is not absolute and must not infringe upon the contractor’s rights. To prevent administrative arbitrariness, legal safeguards have been established, including granting the contractor the right to present a defense before penalties are imposed and subjecting the penalty decision to judicial review for legality and appropriateness. 

الرافدین للحقوقVol. 27(90)
University of Mosul (IQ), Ministry of Health (KW)
Decent work and economic growth
Openalex Percentile: Top 96%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.