Produktivitas Alat Berat Concrete Pump dengan Perbandingan Elevasi Pengecoran

Construction projects are influenced by various factors, one of which is the productivity of heavy equipment used. One such equipment used in concrete pouring projects is the concrete pump, which functions to transport fresh concrete to the pouring location. This study aims to measure the productivity and time efficiency of concrete pump usage in the construction of the Aston Inn Hotel in Lumajang. The equipment's productivity is calculated based on the volume of concrete pumped and the time required for the pouring process. The results showed that the productivity of the concrete pump on the 5th floor was 0.219 m³/min, while on the 6th floor, it was 0.166 m³/min, with an elevation difference of 3.4 meters between the floors. Time efficiency was also measured, with the pouring of 63 m³ of concrete taking between 30 and 45 minutes, depending on the proximity of the concrete mixer truck to the project site. This study provides insights into how optimizing the use of heavy equipment can improve productivity and efficiency in construction projects, especially in concrete pouring tasks with a concrete pump.

Authors

Institutions

Publication Details

Journal
Jurnal Talenta Sipil
Published
2025-02-06
DOI
https://doi.org/10.33087/talentasipil.v8i1.825
Primary Topic
Engineering and Technology Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Produktivitas Alat Berat Concrete Pump dengan Perbandingan Elevasi Pengecoran

Karina Meilawati Eka Putri, Hendrata Wibisana, Maulana Zidan Dwi Cahya, Dimas Bagus Prasetyo
Jurnal Talenta Sipil
Engineering and Technology Innovations
article

Produktivitas Alat Berat Concrete Pump dengan Perbandingan Elevasi Pengecoran

Karina Meilawati Eka Putri, Hendrata Wibisana, Maulana Zidan Dwi Cahya, Dimas Bagus Prasetyo
article en

Abstract

Construction projects are influenced by various factors, one of which is the productivity of heavy equipment used. One such equipment used in concrete pouring projects is the concrete pump, which functions to transport fresh concrete to the pouring location. This study aims to measure the productivity and time efficiency of concrete pump usage in the construction of the Aston Inn Hotel in Lumajang. The equipment's productivity is calculated based on the volume of concrete pumped and the time required for the pouring process. The results showed that the productivity of the concrete pump on the 5th floor was 0.219 m³/min, while on the 6th floor, it was 0.166 m³/min, with an elevation difference of 3.4 meters between the floors. Time efficiency was also measured, with the pouring of 63 m³ of concrete taking between 30 and 45 minutes, depending on the proximity of the concrete mixer truck to the project site. This study provides insights into how optimizing the use of heavy equipment can improve productivity and efficiency in construction projects, especially in concrete pouring tasks with a concrete pump.

Jurnal Talenta SipilVol. 8(1)
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Openalex Percentile: Top 97%
Engineering and Technology Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Produktivitas Alat Berat Concrete Pump dengan Perbandingan Elevasi Pengecoran — Karina Meilawati Eka Putri, Hendrata Wibisana, et al. · Jurnal Talenta Sipil (2025) | TGRS Research Map | TGRS