A Risk Analysis Affecting Project Implementation with Contract Values Below 80% of the Owner's Estimated Price

The number of bids is less than 80% of the HPS, meaning that the work offered will be carried out at a cost of less than 80% of the estimated cost of the person in charge of the work. In the 2020 period the average percentage of contract value with an offer value of < 80% HPS at Agency x tends to increase significantly by 80% compared to the 2019 period. If the HPS preparation is assumed to have been carried out in accordance with expertise and supported by accountable data. Therefore, the implementation of a contract with a bid value below 80% HPS has a greater possibility of risk in the field compared to a contract value with an offer value above 80% HPS. The method used in carrying out this research is the descriptive method, namely through direct interviews with the Commitment Making Officer (PPK) at agency x to obtain information about the purpose of this research, namely, knowing what risks arise, the causes of risks, and what anticipatory steps are taken. to reduce risk. From the results of data processing after being validated with sources, the risks that arise are: contract extension, contract termination, reduced construction age, disputes, and bad news from local media caused by the bid value which is considered unreasonable. Steps taken by the owner as the owner of the project to reduce risk are Terminating the contract for projects found to be deviant according to applicable regulations and tightening supervision to maintain the quality of work.

Authors

Institutions

Publication Details

Journal
Jurnal Talenta Sipil
Published
2025-02-07
DOI
https://doi.org/10.33087/talentasipil.v8i1.781
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Risk Analysis Affecting Project Implementation with Contract Values Below 80% of the Owner's Estimated Price

Bambang Istijono, Taufika Ophiyandri, Siti Rahmi Gustia
Jurnal Talenta Sipil
Construction Project Management and Performance
article

A Risk Analysis Affecting Project Implementation with Contract Values Below 80% of the Owner's Estimated Price

Bambang Istijono, Taufika Ophiyandri, Siti Rahmi Gustia
article en

Abstract

The number of bids is less than 80% of the HPS, meaning that the work offered will be carried out at a cost of less than 80% of the estimated cost of the person in charge of the work. In the 2020 period the average percentage of contract value with an offer value of < 80% HPS at Agency x tends to increase significantly by 80% compared to the 2019 period. If the HPS preparation is assumed to have been carried out in accordance with expertise and supported by accountable data. Therefore, the implementation of a contract with a bid value below 80% HPS has a greater possibility of risk in the field compared to a contract value with an offer value above 80% HPS. The method used in carrying out this research is the descriptive method, namely through direct interviews with the Commitment Making Officer (PPK) at agency x to obtain information about the purpose of this research, namely, knowing what risks arise, the causes of risks, and what anticipatory steps are taken. to reduce risk. From the results of data processing after being validated with sources, the risks that arise are: contract extension, contract termination, reduced construction age, disputes, and bad news from local media caused by the bid value which is considered unreasonable. Steps taken by the owner as the owner of the project to reduce risk are Terminating the contract for projects found to be deviant according to applicable regulations and tightening supervision to maintain the quality of work.

Jurnal Talenta SipilVol. 8(1)
Andalas University (ID)
Openalex Percentile: Top 96%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.