Repair resources scheduling for attention of transitory road disruptions in humanitarian aid networks

• Proposal on scheduling repair resources to deal with temporary road disruptions. • Formulation of a mathematical model for the minimization of total repair completion time. • Constraints of precedence and complementarity between limited resources. • Impact on the scheduling of repair resources is based on conditions of the roads. • Interdependence between crews and machinery according to characteristics of road. The paper examines a proposal on scheduling repair resources to deal with temporary road disruptions in humanitarian aid networks. A mathematical model was formulated, which took minimizing the total time of completion of the repair, as well as the arrival and departure times of crews and repair teams, and relations of precedence and complementarity between resources and the availability of resources into consideration. To validate the model, a real case study was used, where a region is presented, which has been affected by floods that generate temporary road disruptions. Finally, a scenario analysis of the model was performed so that the impact on performance related to the variation of parameters of interest, such as the availability of resources, the repair times of the crews, the machine operating times and the expected restoration completion time can be studied. The results showed that the impact on the scheduling of repair resources and the total repair time depends on the required conditions of the roads that are going to be repaired, interdependence, and resources availability. However, the findings indicated that increases beyond resource availability have no effect on the total completion time. Better results can be achieved in total completion time if arrival and completion times of available resources are properly synchronized. This research is a contribution on the importance of relations of precedence in the scheduling for road repair, the interdependence of resources and the special conditions of allocation between crews and type of machinery according to the affected track, and its impact on the completion times of the repair.

Authors

Publication Details

Journal
Computers & Industrial Engineering
Published
2025-02-28
DOI
https://doi.org/10.1016/j.cie.2025.111020
Citations
1
Primary Topic
Facility Location and Emergency Management
Type
article
Field-Weighted Citation Impact
2.76

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Repair resources scheduling for attention of transitory road disruptions in humanitarian aid networks

Juan Pablo Orejuela Cabrera, José D. Meisel, Carlos Alberto Rojas Trejos, Wilson Adarme Jaimes
1 citations
Computers & Industrial Engineering
Facility Location and Emergency Management
2.76
article

Repair resources scheduling for attention of transitory road disruptions in humanitarian aid networks

Juan Pablo Orejuela Cabrera, José D. Meisel, Carlos Alberto Rojas Trejos, Wilson Adarme Jaimes
article en
1 citations

Abstract

• Proposal on scheduling repair resources to deal with temporary road disruptions. • Formulation of a mathematical model for the minimization of total repair completion time. • Constraints of precedence and complementarity between limited resources. • Impact on the scheduling of repair resources is based on conditions of the roads. • Interdependence between crews and machinery according to characteristics of road. The paper examines a proposal on scheduling repair resources to deal with temporary road disruptions in humanitarian aid networks. A mathematical model was formulated, which took minimizing the total time of completion of the repair, as well as the arrival and departure times of crews and repair teams, and relations of precedence and complementarity between resources and the availability of resources into consideration. To validate the model, a real case study was used, where a region is presented, which has been affected by floods that generate temporary road disruptions. Finally, a scenario analysis of the model was performed so that the impact on performance related to the variation of parameters of interest, such as the availability of resources, the repair times of the crews, the machine operating times and the expected restoration completion time can be studied. The results showed that the impact on the scheduling of repair resources and the total repair time depends on the required conditions of the roads that are going to be repaired, interdependence, and resources availability. However, the findings indicated that increases beyond resource availability have no effect on the total completion time. Better results can be achieved in total completion time if arrival and completion times of available resources are properly synchronized. This research is a contribution on the importance of relations of precedence in the scheduling for road repair, the interdependence of resources and the special conditions of allocation between crews and type of machinery according to the affected track, and its impact on the completion times of the repair.

Computers & Industrial EngineeringVol. 203
Kementerian Sains, Teknologi dan Inovasi, Universidad de Ibagué
Openalex Percentile: Top 12%
Facility Location and Emergency Management
2.76
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.