Effective implementation of controlled blasting methodology during excavation of hard rock in the close proximity of earthen dam and tunnel

The present technical paper outlines the details of the controlled blasting techniques used to optimize blasting pattern for excavation of hard rock near the Bhira Earthen Dam in Maharashtra, India. In this connection, a series of experimental blasts were conducted by adjusting various blast design parameters at project site. The safe charge weight per delay was kept between 0.125 and 0.375 kg. The outcomes of these experimental blasts were analyzed to recommend optimized blasting patterns and methods for the overall excavation process during actual blasting operations. Blast design parameters, including the maximum quantity of explosive per delay, hole depth, burden and spacing between holes were optimized by using a site-specific attenuation equation, taking into account the proximity of the dam and tunnel from the blasting area. Peak particle velocity (PPV) level of 10 mm/s and 50 mm/s respectively were adopted as the safe vibration level for ensuring safety of the Bhira Earthen Dam and the nearby tunnel from the adverse effects of blast vibrations by analyzing the dominant frequency of ground vibrations observed and also by reviewing various international standards. Frequency of the ground vibrations observed on the dam and tunnel from majority of the blasts was found to be more than 10 Hz and 50 Hz respectively. During the entire period of blasting, the blast vibrations were recorded to be far lower than the safe vibration level set for these structures. Maximum Vibration level of about 0.8 mm/s and 35 mm/s were observed on dam and tunnel respectively which are far lower than the safe vibration level adopted for these structures. Hence, the entire excavation work was completed successfully and safely, without endangering the safety of dam or tunnel.

Authors

Institutions

Publication Details

Journal
Defence Technology
Published
2025-02-28
DOI
https://doi.org/10.1016/j.dt.2025.02.026
Citations
1
Primary Topic
Mining and Gasification Technologies
Type
article
Field-Weighted Citation Impact
0.71
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effective implementation of controlled blasting methodology during excavation of hard rock in the close proximity of earthen dam and tunnel

Vijay K. Ghodake, M.L. Meena, Chaman Singh, Prakash K. Palei et al.
1 citations
Defence Technology
Mining and Gasification Technologies
0.71
article

Effective implementation of controlled blasting methodology during excavation of hard rock in the close proximity of earthen dam and tunnel

Vijay K. Ghodake, M.L. Meena, Chaman Singh, Prakash K. Palei, Rizwan Ali, S. Santhosh Kumar, Rajesh Singh Gurjar, R.S. Kankara
article en
1 citations

Abstract

The present technical paper outlines the details of the controlled blasting techniques used to optimize blasting pattern for excavation of hard rock near the Bhira Earthen Dam in Maharashtra, India. In this connection, a series of experimental blasts were conducted by adjusting various blast design parameters at project site. The safe charge weight per delay was kept between 0.125 and 0.375 kg. The outcomes of these experimental blasts were analyzed to recommend optimized blasting patterns and methods for the overall excavation process during actual blasting operations. Blast design parameters, including the maximum quantity of explosive per delay, hole depth, burden and spacing between holes were optimized by using a site-specific attenuation equation, taking into account the proximity of the dam and tunnel from the blasting area. Peak particle velocity (PPV) level of 10 mm/s and 50 mm/s respectively were adopted as the safe vibration level for ensuring safety of the Bhira Earthen Dam and the nearby tunnel from the adverse effects of blast vibrations by analyzing the dominant frequency of ground vibrations observed and also by reviewing various international standards. Frequency of the ground vibrations observed on the dam and tunnel from majority of the blasts was found to be more than 10 Hz and 50 Hz respectively. During the entire period of blasting, the blast vibrations were recorded to be far lower than the safe vibration level set for these structures. Maximum Vibration level of about 0.8 mm/s and 35 mm/s were observed on dam and tunnel respectively which are far lower than the safe vibration level adopted for these structures. Hence, the entire excavation work was completed successfully and safely, without endangering the safety of dam or tunnel.

Defence TechnologyVol. 48
Central Water and Power Research Station (IN)
Sustainable cities and communities
Openalex Percentile: Top 35%
Mining and Gasification Technologies
0.71
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.