Impact of Hybrid UV Photo Curing with Rechargeable Electricity on Trenchless Rehabilitation of Sewage Pipelines

Sewage pipes with structural defects cause ground subsidence owing to the occurrence of cavities, and trenchless rehabilitation is the primary repair method. Most trenchless rehabilitation uses the cured-in-place pipe (CIPP) method with a tube liner. UV photo curing has recently gained prominence for solving problems such as construction quality and high energy consumption associated with conventional thermal curing methods. This study developed a glass fiber tube liner and a hybrid power supply system with a uninterruptible power supply (UPS) and batteries to improve construction quality and shorten construction time when using UV photo curing. The tube liner had a flexural strength of 236.3 MPa and a flexural modulus of 10.5 GPa. These results are 7.88 and 6.2 times higher than the KS M3550-9 standards of 30 MPa and 1.7 GPa, respectively. Therefore, improved construction quality and post-construction sewage pipe lifespan were expected. A field test of construction with UV photo curing, using the glass fiber tube liner and the hybrid power system developed in this study, demonstrated successful performance in terms of power supply stability, UV photo-curing efficiency, and construction quality. Total working time was 121 min for construction of a 50 m section of the D600 using CIPP, significantly reducing construction time compared to conventional UV photo-curing technology.

Authors

Publication Details

Journal
Korean Society of Hazard Mitigation
Published
2025-02-28
DOI
https://doi.org/10.9798/kosham.2025.25.1.181
Citations
1
Primary Topic
Corrosion Behavior and Inhibition
Type
article
Field-Weighted Citation Impact
0.52
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of Hybrid UV Photo Curing with Rechargeable Electricity on Trenchless Rehabilitation of Sewage Pipelines

Imgyu Byun, C.Y. Kim
1 citations
Korean Society of Hazard Mitigation
Corrosion Behavior and Inhibition
0.52
article

Impact of Hybrid UV Photo Curing with Rechargeable Electricity on Trenchless Rehabilitation of Sewage Pipelines

Imgyu Byun, C.Y. Kim
article en
1 citations

Abstract

Sewage pipes with structural defects cause ground subsidence owing to the occurrence of cavities, and trenchless rehabilitation is the primary repair method. Most trenchless rehabilitation uses the cured-in-place pipe (CIPP) method with a tube liner. UV photo curing has recently gained prominence for solving problems such as construction quality and high energy consumption associated with conventional thermal curing methods. This study developed a glass fiber tube liner and a hybrid power supply system with a uninterruptible power supply (UPS) and batteries to improve construction quality and shorten construction time when using UV photo curing. The tube liner had a flexural strength of 236.3 MPa and a flexural modulus of 10.5 GPa. These results are 7.88 and 6.2 times higher than the KS M3550-9 standards of 30 MPa and 1.7 GPa, respectively. Therefore, improved construction quality and post-construction sewage pipe lifespan were expected. A field test of construction with UV photo curing, using the glass fiber tube liner and the hybrid power system developed in this study, demonstrated successful performance in terms of power supply stability, UV photo-curing efficiency, and construction quality. Total working time was 121 min for construction of a 50 m section of the D600 using CIPP, significantly reducing construction time compared to conventional UV photo-curing technology.

Korean Society of Hazard MitigationVol. 25(1)
Openalex Percentile: Top 41%
Corrosion Behavior and Inhibition
0.52
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.