Impact of Project Managers’ Contingent Reward Leadership Style on Performance of BIM Construction Projects

As the construction industry increasingly adopts building information modeling (BIM), identifying effective leadership styles for BIM project management is crucial for project success. Although traditional leadership styles suit conventional construction projects, their applicability to the BIM context remains underexplored. This study partly addresses this gap by investigating how contingent reward leadership style impacts BIM project performance. Utilizing data from a survey of 224 BIM projects and covariance-based structural equation modeling (CB-SEM), this study reveals that the project managers’ contingent reward leadership style significantly enhances BIM project performance, fully mediated by BIM project coordination effectiveness. The study also highlights the confounding impacts of company control over projects and the project’s BIM maturity in information management (IM). Although these factors do not alter the mediation relationship, they contribute to project performance: company behavior control enhances project quality, whereas higher BIM maturity improves project coordination, schedule, budget, and quality performance. The study also reveals that although the contingent reward leadership style consistently benefits BIM projects of varying complexity and countries (Taiwan and Vietnam), its influence on project quality differs between public and private BIM projects. This study enriches the current body of knowledge on BIM and project management. First, it empirically proves the contingent reward leadership style’s effectiveness in BIM project contexts. Second, it bridges two critical but rarely linked concepts: contingent reward leadership and project coordination. Finally, it extends the contingency theory of BIM project management by investigating the underexplored contextual factors, such as company control over projects and the project’s BIM maturity in IM, besides project complexity, project ownership, and country context. This study advances the understanding of leadership dynamics in BIM environments and offers practical insights for BIM practitioners, enabling them to tailor leadership strategies to optimize BIM project outcomes under varying contextual influences.

Authors

Institutions

Publication Details

Journal
Journal of Management in Engineering
Published
2025-02-28
DOI
https://doi.org/10.1061/jmenea.meeng-6557
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of Project Managers’ Contingent Reward Leadership Style on Performance of BIM Construction Projects

Shang‐Hsien Hsieh, Thi Kim Dung Vu
2 citations
Journal of Management in Engineering
Construction Project Management and Performance
4.21
article

Impact of Project Managers’ Contingent Reward Leadership Style on Performance of BIM Construction Projects

Shang‐Hsien Hsieh, Thi Kim Dung Vu
article en
2 citations

Abstract

As the construction industry increasingly adopts building information modeling (BIM), identifying effective leadership styles for BIM project management is crucial for project success. Although traditional leadership styles suit conventional construction projects, their applicability to the BIM context remains underexplored. This study partly addresses this gap by investigating how contingent reward leadership style impacts BIM project performance. Utilizing data from a survey of 224 BIM projects and covariance-based structural equation modeling (CB-SEM), this study reveals that the project managers’ contingent reward leadership style significantly enhances BIM project performance, fully mediated by BIM project coordination effectiveness. The study also highlights the confounding impacts of company control over projects and the project’s BIM maturity in information management (IM). Although these factors do not alter the mediation relationship, they contribute to project performance: company behavior control enhances project quality, whereas higher BIM maturity improves project coordination, schedule, budget, and quality performance. The study also reveals that although the contingent reward leadership style consistently benefits BIM projects of varying complexity and countries (Taiwan and Vietnam), its influence on project quality differs between public and private BIM projects. This study enriches the current body of knowledge on BIM and project management. First, it empirically proves the contingent reward leadership style’s effectiveness in BIM project contexts. Second, it bridges two critical but rarely linked concepts: contingent reward leadership and project coordination. Finally, it extends the contingency theory of BIM project management by investigating the underexplored contextual factors, such as company control over projects and the project’s BIM maturity in IM, besides project complexity, project ownership, and country context. This study advances the understanding of leadership dynamics in BIM environments and offers practical insights for BIM practitioners, enabling them to tailor leadership strategies to optimize BIM project outcomes under varying contextual influences.

Journal of Management in EngineeringVol. 41(3)
National Taiwan University (TW), National Taiwan University Hospital (TW), Hanoi University (VN)
Openalex Percentile: Top 8%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.