Improvement of reliability performance in distribution network by optimal investment selection

Distribution system operators often face financial challenges when planning development strategies for distribution networks. These constraints affect decisions about the order and priority of maintenance tasks and the modernization of systems using equipment that incorporates new functionalities. Therefore, it is crucial to systematically and thoroughly analyze the issue and prioritize investment decisions to maximize benefits. This paper analyses the optimal distribution of limited investment funds in order to minimize the Energy not Supplied (ENS) indicator. The choice of investment options is made from predefined actions that include the construction of new power lines to form semi-rings, the replacement of old components with new ones, the replacement of overhead lines with underground cables, as well as installation of remotely operated disconnectors with fault indicators and installation of reclosers. Minimization ofENSis performed for different values of available investment funds. The optimization algorithm was developed and verified on a test system representative of a typical medium-voltage distribution network topology.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-02-01
DOI
https://doi.org/10.1049/icp.2024.4682
Citations
1
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
1.30
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Improvement of reliability performance in distribution network by optimal investment selection

Jelisaveta Krstivojević, Jelena Stojković Terzić
1 citations
IET conference proceedings.
Power System Reliability and Maintenance
1.30
article

Improvement of reliability performance in distribution network by optimal investment selection

Jelisaveta Krstivojević, Jelena Stojković Terzić
article en
1 citations

Abstract

Distribution system operators often face financial challenges when planning development strategies for distribution networks. These constraints affect decisions about the order and priority of maintenance tasks and the modernization of systems using equipment that incorporates new functionalities. Therefore, it is crucial to systematically and thoroughly analyze the issue and prioritize investment decisions to maximize benefits. This paper analyses the optimal distribution of limited investment funds in order to minimize the Energy not Supplied (ENS) indicator. The choice of investment options is made from predefined actions that include the construction of new power lines to form semi-rings, the replacement of old components with new ones, the replacement of overhead lines with underground cables, as well as installation of remotely operated disconnectors with fault indicators and installation of reclosers. Minimization ofENSis performed for different values of available investment funds. The optimization algorithm was developed and verified on a test system representative of a typical medium-voltage distribution network topology.

IET conference proceedings.Vol. 2024(29)
University of Belgrade (RS)
Openalex Percentile: Top 24%
Power System Reliability and Maintenance
1.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Improvement of reliability performance in distribution network by optimal investment selection — Jelisaveta Krstivojević, Jelena Stojković Terzić · IET conference proceedings. (2025) | TGRS Research Map | TGRS