Primary Risks for Delays and Cost Overruns in the Construction of Drinking Water Supply and Sanitation Projects in Peru

Delays and cost overruns are common problems in construction projects that may jeopardize construction completion when actual construction times and costs substantially differ from estimates in the planning stage. This study examines the risks that contribute to delays and cost overruns in drinking water supply and sanitation projects in Peru. Descriptive statistics, logistic regressions, and Chi-square tests were applied to: (1) identify the primary risks; (2) analyze the influence of contracting characteristics on the occurrence of delays and cost overruns; and (3) explore the association between delays and cost overruns caused by these risks. The analysis of charge order documents from 318 projects in Peru found that 22 of the risks identified in the literature are present in the reviewed projects, along with five additional risks not described in the literature. The results indicate that the most significant risks in terms of frequency of occurrence include: delay in change orders approvals, adverse weather conditions, inaccurate site information, inaccurate cost estimates at the design stage, and land availability problems. Additionally, the contract amount is the most influential variable in the occurrence of delays and cost overruns. The higher the contract amount, the greater the probability of occurrence. This research provides valuable insights for professionals involved in project management, helping them better understand the primary risks contributing to delays and cost overruns.

Authors

Institutions

Publication Details

Journal
Journal of Management in Engineering
Published
2025-02-28
DOI
https://doi.org/10.1061/jmenea.meeng-6496
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Primary Risks for Delays and Cost Overruns in the Construction of Drinking Water Supply and Sanitation Projects in Peru

Cristina Torres-Machí, Laura Montalbán-Domingo, Tatiana García-Segura, Carlos Julca-Varas
1 citations
Journal of Management in Engineering
Construction Project Management and Performance
2.11
article

Primary Risks for Delays and Cost Overruns in the Construction of Drinking Water Supply and Sanitation Projects in Peru

Cristina Torres-Machí, Laura Montalbán-Domingo, Tatiana García-Segura, Carlos Julca-Varas
article en
1 citations

Abstract

Delays and cost overruns are common problems in construction projects that may jeopardize construction completion when actual construction times and costs substantially differ from estimates in the planning stage. This study examines the risks that contribute to delays and cost overruns in drinking water supply and sanitation projects in Peru. Descriptive statistics, logistic regressions, and Chi-square tests were applied to: (1) identify the primary risks; (2) analyze the influence of contracting characteristics on the occurrence of delays and cost overruns; and (3) explore the association between delays and cost overruns caused by these risks. The analysis of charge order documents from 318 projects in Peru found that 22 of the risks identified in the literature are present in the reviewed projects, along with five additional risks not described in the literature. The results indicate that the most significant risks in terms of frequency of occurrence include: delay in change orders approvals, adverse weather conditions, inaccurate site information, inaccurate cost estimates at the design stage, and land availability problems. Additionally, the contract amount is the most influential variable in the occurrence of delays and cost overruns. The higher the contract amount, the greater the probability of occurrence. This research provides valuable insights for professionals involved in project management, helping them better understand the primary risks contributing to delays and cost overruns.

Journal of Management in EngineeringVol. 41(3)
University of Colorado Boulder (US), University of Colorado System (US), Universitat Politècnica de València (ES)
Clean water and sanitation
Openalex Percentile: Top 16%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.