Analysis of Scheduling Method in Building Projects: A Case of Line of Balance and Precedence Diagram Method

The construction industry plays a significant role in a country's economic growth. However, construction projects frequently face challenges in meeting schedule targets. Project scheduling is crucial as it provides insights into enhancing the development process. Various scheduling methods are employed in construction projects, including the line of balance (LoB) method and precedence diagramming. Selecting the appropriate scheduling method impacts the project's timeline. This research aims to analyze the effectiveness of the LoB method and precedence diagramming in building construction projects, with a specific case study of a COVID center. The research method involves collecting project data, including project s-curves. The findings indicate that utilizing both the line of balance and precedence diagram methods can enhance project scheduling by ensuring the continuous allocation of resources.

Authors

Institutions

Publication Details

Journal
MEDIA KOMUNIKASI TEKNIK SIPIL
Published
2024-12-12
DOI
https://doi.org/10.14710/mkts.v30i2.63963
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Scheduling Method in Building Projects: A Case of Line of Balance and Precedence Diagram Method

Andi Anugrah Batari Fatimah, Rosmariani Arifuddin, Muh Rifan Fadlillah
1 links
MEDIA KOMUNIKASI TEKNIK SIPIL
BIM and Construction Integration
article

Analysis of Scheduling Method in Building Projects: A Case of Line of Balance and Precedence Diagram Method

Andi Anugrah Batari Fatimah, Rosmariani Arifuddin, Muh Rifan Fadlillah
article en

Abstract

The construction industry plays a significant role in a country's economic growth. However, construction projects frequently face challenges in meeting schedule targets. Project scheduling is crucial as it provides insights into enhancing the development process. Various scheduling methods are employed in construction projects, including the line of balance (LoB) method and precedence diagramming. Selecting the appropriate scheduling method impacts the project's timeline. This research aims to analyze the effectiveness of the LoB method and precedence diagramming in building construction projects, with a specific case study of a COVID center. The research method involves collecting project data, including project s-curves. The findings indicate that utilizing both the line of balance and precedence diagram methods can enhance project scheduling by ensuring the continuous allocation of resources.

MEDIA KOMUNIKASI TEKNIK SIPILVol. 30(2)
Hasanuddin University (ID)
Openalex Percentile: Top 71%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Scheduling Method in Building Projects: A Case of Line of Balance and Precedence Diagram Method — Andi Anugrah Batari Fatimah, Rosmariani Arifuddin, et al. · MEDIA KOMUNIKASI TEKNIK SIPIL (2024) | TGRS Research Map | TGRS