Mitigation of Delay Risks in Sidewalk Construction Projects in DKI Jakarta Province

The success of a project is primarily measured by its ability to be completed on time and within budget while maintaining the best quality. Therefore, time or project duration is a crucial constraint in construction project management, such as sidewalk construction projects. The purpose of this research is to identify risk variables, risks analysis, and plan risk mitigation that occur during the implementation phase of the sidewalk construction project in DKI Jakarta, which result in time delays. Data collection in this study used interview and questionnaire survey methods, while data analysis employed the Risk Probability and Impact Assessment and Probability and Impact Matrix methods. The results of this study yielded a risk mitigation plan for 2 (two) dominant risk variables that caused delays in the sidewalk construction project in DKI Jakarta, namely the utility relocation and the undetected existing utility system

Authors

Publication Details

Journal
Journal of architecture and civil engineering.
Published
2025-02-01
DOI
https://doi.org/10.35629/8193-10020818
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mitigation of Delay Risks in Sidewalk Construction Projects in DKI Jakarta Province

Hari Nugraha Nurjaman, Dwi Dinariana, Sri Phani Krishna K
Journal of architecture and civil engineering.
Construction Project Management and Performance
article

Mitigation of Delay Risks in Sidewalk Construction Projects in DKI Jakarta Province

Hari Nugraha Nurjaman, Dwi Dinariana, Sri Phani Krishna K
article en

Abstract

The success of a project is primarily measured by its ability to be completed on time and within budget while maintaining the best quality. Therefore, time or project duration is a crucial constraint in construction project management, such as sidewalk construction projects. The purpose of this research is to identify risk variables, risks analysis, and plan risk mitigation that occur during the implementation phase of the sidewalk construction project in DKI Jakarta, which result in time delays. Data collection in this study used interview and questionnaire survey methods, while data analysis employed the Risk Probability and Impact Assessment and Probability and Impact Matrix methods. The results of this study yielded a risk mitigation plan for 2 (two) dominant risk variables that caused delays in the sidewalk construction project in DKI Jakarta, namely the utility relocation and the undetected existing utility system

Journal of architecture and civil engineering.Vol. 10(02)
Openalex Percentile: Top 96%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.