Risk Control Provincial Road Construction Project on Time Performance in Road Section Sumur – Taman Jaya Banten
The road is means transportation land that has role important in develop potential an area, so that all areas can reach level equitable development . Road construction intended For make it easier connection between area and improve level economy community . Based on the Decree of the Governor of Banten in 2023 concerning the status of roads Province , Jalan Sumur - Taman Jaya is one of the Provincial Roads the longest one I have . With condition road rocky and yet get touch pavement road . This road connect from center hustle Subdistrict Well , Regency Pandeglang towards the Ujung Kulon National Park area which is an Indonesian Geopark. With matter The construction of the Sumur – Taman Jaya road is Project Regional Strategic Plan 2023. Research This aiming identify and analyze risk in implementation Construction work of Sumur Road – Taman Jaya towards performance time . The analysis used in study This is analysis descriptive and analytical hierarchy process (AHP) as well as risk level analysis . from analysis conducted 4 risks were found into the risk high , namely , Congestion cash flow , Ignore cost No unexpected , Condition difficult location reachable , Lack of experience manager project .
Authors
- Fitri Suryani (ORCID: https://orcid.org/0000-0002-6372-9021)
- Dwi Dinariana (ORCID: https://orcid.org/0009-0004-0127-3163)
- Lukmanul Hakim (ORCID: https://orcid.org/0000-0003-3471-475X)
Publication Details
- Journal
- Journal of architecture and civil engineering.
- Published
- 2025-02-01
- DOI
- https://doi.org/10.35629/8193-10025270
- Primary Topic
- Occupational Health and Safety Management
- Type
- article
- Field-Weighted Citation Impact
- 0.00