APPLICATION OF NON-PREEMPTIVE PRIORITY SCHEDULING METHOD FOR WORK ORDER SCHEDULING SYSTEM

Work order allocation is one of the problems experienced by PT Indomobil Trada Nasional. Companies need tools to make it easier to allocate work orders effectively, namely an optimal work order scheduling system. Work order allocation data for the last three months was 3,817, with 15 technicians. This work order exceeds the company's target, namely to have a difference of 1.2 work orders per technician daily. These work orders have a priority order in their processing. The work order scheduling method used in this research is the non-preemptive priority scheduling method. The non-preemptive priority scheduling method is used because it can determine which work orders are in the queue and ready to be allocated according to the priority order without disturbing work orders that are being worked on when new work orders arrive. The work order scheduling system that was built provides adequate scheduling time and produces a smaller average waiting time, namely 12.97 minutes. The average waiting time in the scheduling system without priority non-preemptive scheduling is 52.18, and the difference in average waiting time for the 34 existing work orders is 39.12 minutes. Applying the non-preemptive priority scheduling method helps companies allocate work orders optimally.

Authors

Institutions

Publication Details

Journal
JITK (Jurnal Ilmu Pengetahuan dan Teknologi Komputer)
Published
2025-02-26
DOI
https://doi.org/10.33480/jitk.v10i3.5610
Primary Topic
Scheduling and Timetabling Solutions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

APPLICATION OF NON-PREEMPTIVE PRIORITY SCHEDULING METHOD FOR WORK ORDER SCHEDULING SYSTEM

Novita Br Ginting, Suratun Suratun, Zulkarnaen Noor Syarif, Ryan Abdul Gofur
JITK (Jurnal Ilmu Pengetahuan dan Teknologi Komputer)
Scheduling and Timetabling Solutions
article

APPLICATION OF NON-PREEMPTIVE PRIORITY SCHEDULING METHOD FOR WORK ORDER SCHEDULING SYSTEM

Novita Br Ginting, Suratun Suratun, Zulkarnaen Noor Syarif, Ryan Abdul Gofur
article en

Abstract

Work order allocation is one of the problems experienced by PT Indomobil Trada Nasional. Companies need tools to make it easier to allocate work orders effectively, namely an optimal work order scheduling system. Work order allocation data for the last three months was 3,817, with 15 technicians. This work order exceeds the company's target, namely to have a difference of 1.2 work orders per technician daily. These work orders have a priority order in their processing. The work order scheduling method used in this research is the non-preemptive priority scheduling method. The non-preemptive priority scheduling method is used because it can determine which work orders are in the queue and ready to be allocated according to the priority order without disturbing work orders that are being worked on when new work orders arrive. The work order scheduling system that was built provides adequate scheduling time and produces a smaller average waiting time, namely 12.97 minutes. The average waiting time in the scheduling system without priority non-preemptive scheduling is 52.18, and the difference in average waiting time for the 34 existing work orders is 39.12 minutes. Applying the non-preemptive priority scheduling method helps companies allocate work orders optimally.

JITK (Jurnal Ilmu Pengetahuan dan Teknologi Komputer)Vol. 10(3)
Ibn Haldun University (TR)
Openalex Percentile: Top 96%
Scheduling and Timetabling Solutions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

APPLICATION OF NON-PREEMPTIVE PRIORITY SCHEDULING METHOD FOR WORK ORDER SCHEDULING SYSTEM — Novita Br Ginting, Suratun Suratun, et al. · JITK (Jurnal Ilmu Pengetahuan dan Teknologi Komputer) (2025) | TGRS Research Map | TGRS