Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects

Purpose Through a case study for Iran, this research seeks to pinpoint the dominant causes of delay and cost overruns in two standard Support of Excavation methods (Bracing strut and top-down construction) in deep excavation projects from various points of view involving contractors, consultants and owners. This investigation identifies the root causes, compares them with existing literature to find similarities and differences with tunnelling and construction projects and proposes practical solutions. Design/methodology/approach The primary factors were identified after an extensive literature review and expert interview. Subsequently, a questionnaire was designed to classify related factors, considering impact indices, occurrence likelihood and overall significance. Eventually, the findings of the analysis were visually represented through cause-and-effect diagrams. Findings The results indicate that “inflation and exchange rate fluctuation” is the top-rated cause, followed by designers ’ limited overall perspective of implementation issues. Also, comparing the roles of related teams shows that the contractor sector is the most responsible for delay and overruns in both methods. Finally, practical solutions are presented regarding the main affecting factors. Originality/value Prior research often addresses delay and costs in construction, but insufficient focus is given to deep excavation projects, particularly in Iran. This study not only fills the identified knowledge gap but also delves into the causes of delay, pursued until the fourth bone in some cases and proposes a solution framework derived from previous research, case studies and expert insights to mitigate construction delay.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2025-02-26
DOI
https://doi.org/10.1108/bepam-02-2024-0030
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects

Reza Akherati, Jalal Kasebzadeh, Roohollah Kalatehjari, Sara Bayandor
1 citations
Built Environment Project and Asset Management
Construction Project Management and Performance
2.11
article

Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects

Reza Akherati, Jalal Kasebzadeh, Roohollah Kalatehjari, Sara Bayandor
article en
1 citations

Abstract

Purpose Through a case study for Iran, this research seeks to pinpoint the dominant causes of delay and cost overruns in two standard Support of Excavation methods (Bracing strut and top-down construction) in deep excavation projects from various points of view involving contractors, consultants and owners. This investigation identifies the root causes, compares them with existing literature to find similarities and differences with tunnelling and construction projects and proposes practical solutions. Design/methodology/approach The primary factors were identified after an extensive literature review and expert interview. Subsequently, a questionnaire was designed to classify related factors, considering impact indices, occurrence likelihood and overall significance. Eventually, the findings of the analysis were visually represented through cause-and-effect diagrams. Findings The results indicate that “inflation and exchange rate fluctuation” is the top-rated cause, followed by designers ’ limited overall perspective of implementation issues. Also, comparing the roles of related teams shows that the contractor sector is the most responsible for delay and overruns in both methods. Finally, practical solutions are presented regarding the main affecting factors. Originality/value Prior research often addresses delay and costs in construction, but insufficient focus is given to deep excavation projects, particularly in Iran. This study not only fills the identified knowledge gap but also delves into the causes of delay, pursued until the fourth bone in some cases and proposes a solution framework derived from previous research, case studies and expert insights to mitigate construction delay.

Built Environment Project and Asset ManagementVol. 15(2)
Islamic Azad University of Zanjan (IR), Auckland University of Technology (NZ), Shahid Beheshti University (IR)
Openalex Percentile: Top 16%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.