Recovery-Oriented Optimal Investment Planning for Power Grid: A Two-Stage Risk-Averse Optimization Approach

The occurrence of high-impact, low-probability natural disasters poses a threat to the power grid, leading to potential widespread disruptions and raising stringent requirements for power grid restoration capability. Moreover, the indeterminate magnitude of damage resulting from such catastrophes introduces additional risks. In order to develop a far-sighted plan and enhance the restoration capability of power grid, this paper proposes a stochastic recovery-oriented power grid investment planning model which integrates preventive hardening measures and responsive backup generator (BG) support to mitigate the impact of disasters and facilitate efficient rehabilitation. The recovery process entails a sequential restoration of impaired transmission lines, offline buses, offline generators, and offline renewable power generations (RPGs). Then, a risk-averse planning strategy using two-stage stochastic information gap decision theory (IGDT) is adopted in the proposed baseline model to counter the uncertainty surrounding the severity of natural disasters. The effectiveness of the proposed method is validated through numerical tests conducted on the New England 10-machine 39-bus system, which demonstrate its potential in reducing recovery time and minimizing losses during power grid restoration by allocating additional resources.

Authors

Institutions

Publication Details

Published
2024-11-24
DOI
https://doi.org/10.1109/ispec59716.2024.10892439
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Recovery-Oriented Optimal Investment Planning for Power Grid: A Two-Stage Risk-Averse Optimization Approach

Nan Yang, Heng Zhang, Zheng Wang, Zijun Yuan et al.
Electric Power System Optimization
article

Recovery-Oriented Optimal Investment Planning for Power Grid: A Two-Stage Risk-Averse Optimization Approach

Nan Yang, Heng Zhang, Zheng Wang, Zijun Yuan, Haozhong Cheng, Jianzhong Lu
article en

Abstract

The occurrence of high-impact, low-probability natural disasters poses a threat to the power grid, leading to potential widespread disruptions and raising stringent requirements for power grid restoration capability. Moreover, the indeterminate magnitude of damage resulting from such catastrophes introduces additional risks. In order to develop a far-sighted plan and enhance the restoration capability of power grid, this paper proposes a stochastic recovery-oriented power grid investment planning model which integrates preventive hardening measures and responsive backup generator (BG) support to mitigate the impact of disasters and facilitate efficient rehabilitation. The recovery process entails a sequential restoration of impaired transmission lines, offline buses, offline generators, and offline renewable power generations (RPGs). Then, a risk-averse planning strategy using two-stage stochastic information gap decision theory (IGDT) is adopted in the proposed baseline model to counter the uncertainty surrounding the severity of natural disasters. The effectiveness of the proposed method is validated through numerical tests conducted on the New England 10-machine 39-bus system, which demonstrate its potential in reducing recovery time and minimizing losses during power grid restoration by allocating additional resources.

Shanghai Jiao Tong University (CN)
Openalex Percentile: Top 74%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Recovery-Oriented Optimal Investment Planning for Power Grid: A Two-Stage Risk-Averse Optimization Approach — Nan Yang, Heng Zhang, et al. · (2024) | TGRS Research Map | TGRS