Macrogrids and Supergrids: Wide Area Transmission to Improve Electrification and Variable Renewable Energy Use

Studies have shown that wide area high-voltage dc (HVdc) electric power grids will be needed for the future. In North America, these are known as “macrogrids” and in Europe, “supergrids,” which are sometimes referred to as “hypergrids.” There are obstacles in the way to achieving these wide area grids, however. What are these obstacles, and how can they be overcome? Such obstacles include passing through multiple jurisdictions and obtaining permitting. The NIMBY challenge is one such issue. Of course, a wide area transmission grid will pass through different countries and states, adding to the permitting challenge. The processes that are being applied include the use of rights-of-way of existing railroads or highways. Underwater locations may include those beneath lakes and rivers as well as those undersea. In the United States, the right-of-way of a rail line is being used to traverse several states for 2,100-MW, ±525-kV HVdc cables. Roadside rights-of-way are also under active consideration for HVdc cables for the macrogrid.

Authors

Institutions

Publication Details

Journal
IEEE Power and Energy Magazine
Published
2025-02-26
DOI
https://doi.org/10.1109/mpe.2024.3427727
Citations
1
Primary Topic
Microgrid Control and Optimization
Type
article
Field-Weighted Citation Impact
1.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Macrogrids and Supergrids: Wide Area Transmission to Improve Electrification and Variable Renewable Energy Use

D.A. Woodford
1 citations
IEEE Power and Energy Magazine
Microgrid Control and Optimization
1.21
article

Macrogrids and Supergrids: Wide Area Transmission to Improve Electrification and Variable Renewable Energy Use

D.A. Woodford
article en
1 citations

Abstract

Studies have shown that wide area high-voltage dc (HVdc) electric power grids will be needed for the future. In North America, these are known as “macrogrids” and in Europe, “supergrids,” which are sometimes referred to as “hypergrids.” There are obstacles in the way to achieving these wide area grids, however. What are these obstacles, and how can they be overcome? Such obstacles include passing through multiple jurisdictions and obtaining permitting. The NIMBY challenge is one such issue. Of course, a wide area transmission grid will pass through different countries and states, adding to the permitting challenge. The processes that are being applied include the use of rights-of-way of existing railroads or highways. Underwater locations may include those beneath lakes and rivers as well as those undersea. In the United States, the right-of-way of a rail line is being used to traverse several states for 2,100-MW, ±525-kV HVdc cables. Roadside rights-of-way are also under active consideration for HVdc cables for the macrogrid.

IEEE Power and Energy MagazineVol. 23(2)
Electrovaya (Canada) (CA)
Affordable and clean energy
Openalex Percentile: Top 24%
Microgrid Control and Optimization
1.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Macrogrids and Supergrids: Wide Area Transmission to Improve Electrification and Variable Renewable Energy Use — D.A. Woodford · IEEE Power and Energy Magazine (2025) | TGRS Research Map | TGRS