Delays in construction projects pose a major challenge, leading to inefficiencies in time, cost, and resource utilization. This research aims to identify the dominant factors contributing to project delays and propose effective mitigation strategies using the Lean Six Sigma framework. The research focuses on a refinery and wastewater treatment plant construction project in Sidoarjo, Indonesia, which experienced a nine-month delay due to improper planning, inadequate resource allocation, and misaligned project schedules. A mixed-method approach was applied, combining quantitative analysis through Likert-scale surveys and qualitative insights from expert interviews. The Lean Six Sigma methodology, particularly the DMAIC (Define, Measure, Analyze, Improve, Control) framework, was utilized to systematically diagnose delay factors and develop corrective actions. Key findings indicate that external variables such as late payments, extreme weather, and bureaucratic licensing issues significantly impact project timelines. Internal factors, including labor quality and ineffective communication, also contribute to delays. Through the Improve phase, Lean Construction techniques such as Value Stream Mapping and the Last Planner System were implemented, leading to a 30% reduction in project delays. These results highlight the effectiveness of Lean Six Sigma in optimizing construction project management. The research underscores the necessity of integrating structured risk management and process improvement strategies to enhance project efficiency and minimize future delays.

Authors

Institutions

Publication Details

Journal
Asian Journal of Engineering Social and Health
Published
2025-02-20
DOI
https://doi.org/10.46799/ajesh.v4i2.527
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Factors Contributing to Project Delays Using The Lean Six Sigma Approach

Sajiyo Sajiyo, Andi Patriadi, Ainur Ihsabaihaki
Asian Journal of Engineering Social and Health
Quality and Supply Management
article

Analysis of Factors Contributing to Project Delays Using The Lean Six Sigma Approach

Sajiyo Sajiyo, Andi Patriadi, Ainur Ihsabaihaki
article en

Abstract

Delays in construction projects pose a major challenge, leading to inefficiencies in time, cost, and resource utilization. This research aims to identify the dominant factors contributing to project delays and propose effective mitigation strategies using the Lean Six Sigma framework. The research focuses on a refinery and wastewater treatment plant construction project in Sidoarjo, Indonesia, which experienced a nine-month delay due to improper planning, inadequate resource allocation, and misaligned project schedules. A mixed-method approach was applied, combining quantitative analysis through Likert-scale surveys and qualitative insights from expert interviews. The Lean Six Sigma methodology, particularly the DMAIC (Define, Measure, Analyze, Improve, Control) framework, was utilized to systematically diagnose delay factors and develop corrective actions. Key findings indicate that external variables such as late payments, extreme weather, and bureaucratic licensing issues significantly impact project timelines. Internal factors, including labor quality and ineffective communication, also contribute to delays. Through the Improve phase, Lean Construction techniques such as Value Stream Mapping and the Last Planner System were implemented, leading to a 30% reduction in project delays. These results highlight the effectiveness of Lean Six Sigma in optimizing construction project management. The research underscores the necessity of integrating structured risk management and process improvement strategies to enhance project efficiency and minimize future delays.

Asian Journal of Engineering Social and HealthVol. 4(2)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 95%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Factors Contributing to Project Delays Using The Lean Six Sigma Approach — Sajiyo Sajiyo, Andi Patriadi, et al. · Asian Journal of Engineering Social and Health (2025) | TGRS Research Map | TGRS