WTG grid compliance testing and validation part 2: combined test rig- and prototype WTG-based model validation proposal

The traditional method for electrical model validation of Wind Turbine Generators (WTG) relies on full-scale field prototype turbine testing. Model validation based on full-scale field testing is, without argument, the most reliable and robust way, but it also presents limitations. Major limitations include the scope of faults, controllability of events, time, and ultimately, cost. There are events such as phase jump, fast frequency change, single-phase-to-ground faults, etc., that would require an advanced test container setup to be performed on full-scale field testing. Furthermore, the availability of the turbine for testing is also heavily dependent on the weather/wind conditions, which can considerably prolong the test campaign. To address these limitations, this paper proposes a strategy, backed by the results from Part 1 of the paper, that utilizes EMT models and test rigs to enhance the testing and validation robustness of a new WTG. The proposed strategy includes three pillars: using EMT models for assessment before testing, conducting test rig testing for grid compliance and model validation, and finally, testing and verification with a reduced scope on the full-scale field turbine. By including additional steps prior to testing on the field prototype WTG, this strategy aims to build a more robust testing and validation strategy for developing better models to be used in studies during the design and operational life cycles of WPPs. The results presented in the paper show that this process can speed up model delivery while improving robustness. The paper further highlights that grid compliance can be tested and validated in different ways, and flexibility on the requirements to Original Equipment Manufacturers (OEMs) shall be present to allow more innovation in the processes while ensuring that model validation and model quality, as the main objective, is maintained.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-02-01
DOI
https://doi.org/10.1049/icp.2024.3861
Citations
1
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

WTG grid compliance testing and validation part 2: combined test rig- and prototype WTG-based model validation proposal

Thomas Dreyer, Gabriel Miguel Gomes Guerreiro, Ranjan Sharma, Mohsen Neshati et al.
1 citations
IET conference proceedings.
Power Systems and Technologies
0.73
article

WTG grid compliance testing and validation part 2: combined test rig- and prototype WTG-based model validation proposal

Thomas Dreyer, Gabriel Miguel Gomes Guerreiro, Ranjan Sharma, Mohsen Neshati, Owen Curran, Pankaj Kumar, Kim H. Jensen
article en
1 citations

Abstract

The traditional method for electrical model validation of Wind Turbine Generators (WTG) relies on full-scale field prototype turbine testing. Model validation based on full-scale field testing is, without argument, the most reliable and robust way, but it also presents limitations. Major limitations include the scope of faults, controllability of events, time, and ultimately, cost. There are events such as phase jump, fast frequency change, single-phase-to-ground faults, etc., that would require an advanced test container setup to be performed on full-scale field testing. Furthermore, the availability of the turbine for testing is also heavily dependent on the weather/wind conditions, which can considerably prolong the test campaign. To address these limitations, this paper proposes a strategy, backed by the results from Part 1 of the paper, that utilizes EMT models and test rigs to enhance the testing and validation robustness of a new WTG. The proposed strategy includes three pillars: using EMT models for assessment before testing, conducting test rig testing for grid compliance and model validation, and finally, testing and verification with a reduced scope on the full-scale field turbine. By including additional steps prior to testing on the field prototype WTG, this strategy aims to build a more robust testing and validation strategy for developing better models to be used in studies during the design and operational life cycles of WPPs. The results presented in the paper show that this process can speed up model delivery while improving robustness. The paper further highlights that grid compliance can be tested and validated in different ways, and flexibility on the requirements to Original Equipment Manufacturers (OEMs) shall be present to allow more innovation in the processes while ensuring that model validation and model quality, as the main objective, is maintained.

IET conference proceedings.Vol. 2024(16)
Gamesa (Spain) (ES), Siemens Gamesa Renewable Energy (Spain)
Openalex Percentile: Top 31%
Power Systems and Technologies
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.