Overvoltage ride-through requirements in the Finnish converter dominated power system

Additional reactive current injection is often required in the grid codes from converter-connected power plants to mitigate overvoltages and to increase residual voltages during faults. This paper studies the effect of additional inductive current injection on overvoltages using electromagnetic transient (EMT) simulations with manufacturer-specific wind power plant (WPP) models. The objective of the study is to propose additional inductive current injection and overvoltage ride-through (OVRT) requirements for the next Finnish grid code revision and to study whether additional capacitive current injection requirement can cause overvoltages after fault clearing. The study is conducted by using two grid models: 1) a simple model consisting of few WPP models and a meshed network and 2) a large-scale model representing the western part of the Finnish transmission system. The study revealed that fault ride-through (FRT) mode of the WPPs contributes to overvoltages after fault clearing, due to the pre-disturbance reactive power produced by the wind turbines following voltage recovery. Utilizing additional inductive current injection significantly reduced the overvoltages. Furthermore, additional capacitive current injection magnitude had an insignificant effect on the overvoltage occurring after fault clearing. Based on the results, additional inductive current injection and OVRT requirements were proposed for the Finnish grid code revision.

Authors

Publication Details

Journal
IET conference proceedings.
Published
2025-02-01
DOI
https://doi.org/10.1049/icp.2024.3802
Primary Topic
Real-time simulation and control systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Overvoltage ride-through requirements in the Finnish converter dominated power system

Olli-Pekka Janhunen, M. Lindroos
IET conference proceedings.
Real-time simulation and control systems
article

Overvoltage ride-through requirements in the Finnish converter dominated power system

Olli-Pekka Janhunen, M. Lindroos
article en

Abstract

Additional reactive current injection is often required in the grid codes from converter-connected power plants to mitigate overvoltages and to increase residual voltages during faults. This paper studies the effect of additional inductive current injection on overvoltages using electromagnetic transient (EMT) simulations with manufacturer-specific wind power plant (WPP) models. The objective of the study is to propose additional inductive current injection and overvoltage ride-through (OVRT) requirements for the next Finnish grid code revision and to study whether additional capacitive current injection requirement can cause overvoltages after fault clearing. The study is conducted by using two grid models: 1) a simple model consisting of few WPP models and a meshed network and 2) a large-scale model representing the western part of the Finnish transmission system. The study revealed that fault ride-through (FRT) mode of the WPPs contributes to overvoltages after fault clearing, due to the pre-disturbance reactive power produced by the wind turbines following voltage recovery. Utilizing additional inductive current injection significantly reduced the overvoltages. Furthermore, additional capacitive current injection magnitude had an insignificant effect on the overvoltage occurring after fault clearing. Based on the results, additional inductive current injection and OVRT requirements were proposed for the Finnish grid code revision.

IET conference proceedings.Vol. 2024(16)
Affordable and clean energy
Openalex Percentile: Top 97%
Real-time simulation and control systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.