A study on frequency fluctuation with ramp rate limit of wind power plants in the Japanese AGC30 model

In anticipation of the future interconnection of large-scale wind power plants, grid interconnection regulation that limits the output ramp rate limit of domestic wind power plants to "10% for 5 minutes" came into force in 2020. The authors have previously clarified the impact of the output ramp rate limit on the frequency fluctuation of the power system through numerical simulations using the EAST 10-machine System Model developed by the Institute of Electrical Engineers of Japan in 1999. However, the EAST 10-machine System Model was not necessarily suitable for steady-state frequency analysis, and further analysis using a generalized model was necessary. In this paper, we conducted a similar study using the AGC30 model which was also developed by the Institute of Electrical Engineers of Japan in 2016, a standard analysis model for frequency simulation that can simulate frequency fluctuations in more detail than the EAST 10-machine System Model, and clarified that there was no significant difference depending on whether the output ramp rate limit for wind power plants is applied or not, and that it is important to distinguish between having the function and utilization.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-02-01
DOI
https://doi.org/10.1049/icp.2024.3910
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A study on frequency fluctuation with ramp rate limit of wind power plants in the Japanese AGC30 model

Nobutoshi NISHIO, Kenta Koiwa, Yuta Yoshida, Hitoshi Morita et al.
IET conference proceedings.
Power Systems and Renewable Energy
article

A study on frequency fluctuation with ramp rate limit of wind power plants in the Japanese AGC30 model

Nobutoshi NISHIO, Kenta Koiwa, Yuta Yoshida, Hitoshi Morita, Jun‐ichi Suzuki
article en

Abstract

In anticipation of the future interconnection of large-scale wind power plants, grid interconnection regulation that limits the output ramp rate limit of domestic wind power plants to "10% for 5 minutes" came into force in 2020. The authors have previously clarified the impact of the output ramp rate limit on the frequency fluctuation of the power system through numerical simulations using the EAST 10-machine System Model developed by the Institute of Electrical Engineers of Japan in 1999. However, the EAST 10-machine System Model was not necessarily suitable for steady-state frequency analysis, and further analysis using a generalized model was necessary. In this paper, we conducted a similar study using the AGC30 model which was also developed by the Institute of Electrical Engineers of Japan in 2016, a standard analysis model for frequency simulation that can simulate frequency fluctuations in more detail than the EAST 10-machine System Model, and clarified that there was no significant difference depending on whether the output ramp rate limit for wind power plants is applied or not, and that it is important to distinguish between having the function and utilization.

IET conference proceedings.Vol. 2024(16)
Chiba University (JP), J-Power (Japan) (JP)
Affordable and clean energy
Openalex Percentile: Top 98%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines