Transient challenges of a BESS grid-forming integration project

Hydro-Québec conducted a pilot project using a battery energy storage system (BESS) operating as the source of an islanded network. The BESS operates in grid-connected mode when it is charging from the grid. The BESS will be operated in islanded mode when the main power source is unavailable. The technical specifications required the BESS to replicate the behaviour of a synchronous generator in grid-forming operation. The approach was to perform electromagnetic transient (EMT) simulations, and to compare it to on-site testing with transient recorder and BESS fault tests. The transient studies and test records allowed the identification of some performance issues related to this technology that may be difficult to observe with another approach. The transient phenomena are as important as the steady state performances and should be the main design factor for these types of projects. The paper shows some challenges and issues related to transients that improved the BESS. It also shows some corrections and recommendations that shall be applied for future projects. Some of those challenges are:•Control algorithms during a fault.•Overvoltages observed when transitioning from a grid-connected to an islanded state.•Power oscillations due to control instabilities.•Differences between fault tests results and simulations.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-02-01
DOI
https://doi.org/10.1049/icp.2024.3765
Citations
1
Primary Topic
Distributed and Parallel Computing Systems
Type
article
Field-Weighted Citation Impact
1.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transient challenges of a BESS grid-forming integration project

Jean-François Haché, Omar M. Saad, Pierre-Luc Martel, Habacuc Honvo et al.
1 citations
IET conference proceedings.
Distributed and Parallel Computing Systems
1.49
article

Transient challenges of a BESS grid-forming integration project

Jean-François Haché, Omar M. Saad, Pierre-Luc Martel, Habacuc Honvo, Rémi Desrochers, Abdoulaye D. Sy
article en
1 citations

Abstract

Hydro-Québec conducted a pilot project using a battery energy storage system (BESS) operating as the source of an islanded network. The BESS operates in grid-connected mode when it is charging from the grid. The BESS will be operated in islanded mode when the main power source is unavailable. The technical specifications required the BESS to replicate the behaviour of a synchronous generator in grid-forming operation. The approach was to perform electromagnetic transient (EMT) simulations, and to compare it to on-site testing with transient recorder and BESS fault tests. The transient studies and test records allowed the identification of some performance issues related to this technology that may be difficult to observe with another approach. The transient phenomena are as important as the steady state performances and should be the main design factor for these types of projects. The paper shows some challenges and issues related to transients that improved the BESS. It also shows some corrections and recommendations that shall be applied for future projects. Some of those challenges are:•Control algorithms during a fault.•Overvoltages observed when transitioning from a grid-connected to an islanded state.•Power oscillations due to control instabilities.•Differences between fault tests results and simulations.

IET conference proceedings.Vol. 2024(16)
Hydro-Québec (CA)
Openalex Percentile: Top 20%
Distributed and Parallel Computing Systems
1.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.