Exploring the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in prefabricated building projects

Purpose Prefabricated building projects (PBPs) require multiple stakeholder collaboration due to the strong linkages between the design, production and installment of the precast components. Current contractual governance fails to foster a trusting environment for stakeholder collaboration, leading to conflicts of interest, cost overrun and delays in project schedules. Previous studies revealed that terminating shortcomings in contractual governance can be mitigated by implementing relational governance mechanisms. This study aims to explore the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in PBPs and identifies the practical configurational conditions to achieve high stakeholder collaboration. Design/methodology/approach Data were collected from 39 experts through semi-structured interviews and analyzed to explore the configuration effects on stakeholder collaboration in PBPs through fuzzy-set qualitative comparative analysis (fsQCA). Findings Our study reveals that stakeholder collaboration requires configurational conditions of multiple governance elements (i.e. historical working experience and risk-sharing, reward, selection, authorization, trust, commitment and communication mechanisms). Four equivalent configurational strategies were identified for achieving high stakeholder collaboration in PBPs. These included three configurational strategies dominated by relational governance mechanisms and one configurational strategy complementary to contractual and relational governance mechanisms. The configurations dominated by relational governance mechanisms were developed with communication mechanisms and historical working experiences as core conditions; the configurational strategy with complementary contractual and relational governance mechanisms was centered on risk-sharing, reward and trust mechanisms as core conditions. Originality/value Our study enriches the literature on the antecedents of stakeholder collaboration in the PBPs by testing the significance of the relational governance mechanism, which expands the implications of relational contract theory. It also expands the implications of stakeholder theory in PBPs by exploring the asymmetric causal relationship between project contractual governance and stakeholder collaboration. Meanwhile, this study recommends countermeasures for managers to improve stakeholder collaboration by providing four practical configurational conditions in PBPs.

Authors

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-02-24
DOI
https://doi.org/10.1108/ecam-06-2024-0798
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in prefabricated building projects

Xue Hong, Lin Zhang, Jing Zhou
2 citations
Engineering Construction & Architectural Management
Construction Project Management and Performance
4.21
article

Exploring the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in prefabricated building projects

Xue Hong, Lin Zhang, Jing Zhou
article en
2 citations

Abstract

Purpose Prefabricated building projects (PBPs) require multiple stakeholder collaboration due to the strong linkages between the design, production and installment of the precast components. Current contractual governance fails to foster a trusting environment for stakeholder collaboration, leading to conflicts of interest, cost overrun and delays in project schedules. Previous studies revealed that terminating shortcomings in contractual governance can be mitigated by implementing relational governance mechanisms. This study aims to explore the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in PBPs and identifies the practical configurational conditions to achieve high stakeholder collaboration. Design/methodology/approach Data were collected from 39 experts through semi-structured interviews and analyzed to explore the configuration effects on stakeholder collaboration in PBPs through fuzzy-set qualitative comparative analysis (fsQCA). Findings Our study reveals that stakeholder collaboration requires configurational conditions of multiple governance elements (i.e. historical working experience and risk-sharing, reward, selection, authorization, trust, commitment and communication mechanisms). Four equivalent configurational strategies were identified for achieving high stakeholder collaboration in PBPs. These included three configurational strategies dominated by relational governance mechanisms and one configurational strategy complementary to contractual and relational governance mechanisms. The configurations dominated by relational governance mechanisms were developed with communication mechanisms and historical working experiences as core conditions; the configurational strategy with complementary contractual and relational governance mechanisms was centered on risk-sharing, reward and trust mechanisms as core conditions. Originality/value Our study enriches the literature on the antecedents of stakeholder collaboration in the PBPs by testing the significance of the relational governance mechanism, which expands the implications of relational contract theory. It also expands the implications of stakeholder theory in PBPs by exploring the asymmetric causal relationship between project contractual governance and stakeholder collaboration. Meanwhile, this study recommends countermeasures for managers to improve stakeholder collaboration by providing four practical configurational conditions in PBPs.

Engineering Construction & Architectural Management
Openalex Percentile: Top 8%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.