Optimization of Elman Neural Network Using Genetic Algorithm for Construction Cost Estimation and Overspending Risk Analysis

This study proposes a model based on the Elman neural network and improves it using a Genetic Algorithm (GA) to increase the accuracy of construction cost estimation and accurately analyze the overspending risk. First, an index system containing multiple dimensions such as building features, structural features, project positioning, and project environment is constructed to comprehensively capture the key factors affecting construction cost and overspending risk. Second, the Elman neural network’s structure and operation are thoroughly examined, and the GA optimizes the network’s weights and thresholds to improve the model’s predictive power. On the training set, the optimized GA-Elman model demonstrates great prediction accuracy, with relative error (RE) percentages between predicted and true values typically falling within ±1%. On the test set, the GA-Elman model performs better than the original Elman model in both difference and RE, with a Mean Absolute Percentage Error of 2.75%, a decrease of 18.4% compared to the Elman model. These results indicate that the GA-Elman model is more accurate in cost prediction and more effective in identifying potential overspending risks. This study provides a powerful tool for cost control and budget management in the construction industry and a new perspective on the application of neural networks in construction economics

Authors

Publication Details

Journal
Informatica
Published
2025-02-23
DOI
https://doi.org/10.31449/inf.v49i12.7592
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
2.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Elman Neural Network Using Genetic Algorithm for Construction Cost Estimation and Overspending Risk Analysis

Qian Wu
2 citations
Informatica
BIM and Construction Integration
2.01
article

Optimization of Elman Neural Network Using Genetic Algorithm for Construction Cost Estimation and Overspending Risk Analysis

Qian Wu
article en
2 citations

Abstract

This study proposes a model based on the Elman neural network and improves it using a Genetic Algorithm (GA) to increase the accuracy of construction cost estimation and accurately analyze the overspending risk. First, an index system containing multiple dimensions such as building features, structural features, project positioning, and project environment is constructed to comprehensively capture the key factors affecting construction cost and overspending risk. Second, the Elman neural network’s structure and operation are thoroughly examined, and the GA optimizes the network’s weights and thresholds to improve the model’s predictive power. On the training set, the optimized GA-Elman model demonstrates great prediction accuracy, with relative error (RE) percentages between predicted and true values typically falling within ±1%. On the test set, the GA-Elman model performs better than the original Elman model in both difference and RE, with a Mean Absolute Percentage Error of 2.75%, a decrease of 18.4% compared to the Elman model. These results indicate that the GA-Elman model is more accurate in cost prediction and more effective in identifying potential overspending risks. This study provides a powerful tool for cost control and budget management in the construction industry and a new perspective on the application of neural networks in construction economics

InformaticaVol. 49(12)
Openalex Percentile: Top 16%
BIM and Construction Integration
2.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of Elman Neural Network Using Genetic Algorithm for Construction Cost Estimation and Overspending Risk Analysis — Qian Wu · Informatica (2025) | TGRS Research Map | TGRS