Study of discharges observed in the CMS GE1/1 station during LHC Run-3

Since July 2022, GE1/1, the first station using Gas Electron Multiplier (GEM) technology in the Compact Muon Solenoid (CMS) experiment, has been participating in the data-taking in proton–proton (p–p) collisions. This station is the first of three (GE1/1, GE2/1 and ME0) planned to be installed in CMS, to cope with the challenging conditions given by the upgrade of luminosity of the Large Hadron Collider (High-Luminosity LHC program, or HL-LHC) (Colaleo et al., 2015) . This contribution illustrates in detail the analysis developed to monitor the discharge rate per each LHC fill and the strategies developed to operate the chambers safely. An important intervention was the modification of the High Voltage (HV) power system, to correctly power detectors affected by short circuits in the GEM foils. The contribution will also present the current status of operation for GE1/1 in Run-3 in 2023 and the next steps to be implemented to improve the behaviour of the detectors.

Authors

Institutions

Publication Details

Journal
Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment
Published
2025-02-22
DOI
https://doi.org/10.1016/j.nima.2025.170330
Citations
1
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
1.87
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study of discharges observed in the CMS GE1/1 station during LHC Run-3

S. Calzaferri
1 citations
Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment
Particle Detector Development and Performance
1.87
article

Study of discharges observed in the CMS GE1/1 station during LHC Run-3

S. Calzaferri
article en
1 citations

Abstract

Since July 2022, GE1/1, the first station using Gas Electron Multiplier (GEM) technology in the Compact Muon Solenoid (CMS) experiment, has been participating in the data-taking in proton–proton (p–p) collisions. This station is the first of three (GE1/1, GE2/1 and ME0) planned to be installed in CMS, to cope with the challenging conditions given by the upgrade of luminosity of the Large Hadron Collider (High-Luminosity LHC program, or HL-LHC) (Colaleo et al., 2015) . This contribution illustrates in detail the analysis developed to monitor the discharge rate per each LHC fill and the strategies developed to operate the chambers safely. An important intervention was the modification of the High Voltage (HV) power system, to correctly power detectors affected by short circuits in the GEM foils. The contribution will also present the current status of operation for GE1/1 in Run-3 in 2023 and the next steps to be implemented to improve the behaviour of the detectors.

Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated EquipmentVol. 1075
University of Pavia (IT), Istituto Nazionale di Fisica Nucleare, Sezione di Pavia (IT)
Openalex Percentile: Top 15%
Particle Detector Development and Performance
1.87
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.