Financial Feasibility Study for The Construction of The Pulo Gebang–Joglo Light Rail Transit (LRT) Project

The DKI Jakarta Regional Government is evaluating a rail Public-Private Partnership (PPP) proposal for the Pulo Gebang-Joglo Light Rail Transit (LRT) under the Unsolicited Local Government and Business Entity Cooperation (KPDBU) scheme. This thesis examines the project's feasibility, focusing on financial and risk aspects. The proposal is currently under review by the DKI Jakarta Provincial Government. Passenger forecasts include pessimistic, moderate, and optimistic scenarios to estimate potential revenue. Investment costs (capex) and service revenue are calculated for a 30-year concession period. A financial feasibility study, assuming 4% inflation and a 9.15% benchmark interest rate, utilizes Net Present Value (NPV), Internal Rate of Return (IRR), Profitability Index (PI), and payback period metrics. The project is deemed financially viable under the Availability Payment (AP) scheme, yielding an NPV of Rp14.23 trillion, an IRR of 11.77%, and a PI of 1.035. The payback period is projected at twelve years, with annual AP payments of Rp1.94 trillion over the concession period. Risk analysis identified 16 risks across six categories, with 44% classified as very high, 38% high, and 19% medium. Financial aspects based on VAT Regulation No. 2 of 2020 scored 52.5%, the PPP aspect 41.7%, and government support/government guarantees 50%. Despite its financial feasibility, the unsolicited KPDBU proposal requires further refinement, particularly regarding AP financing and tariff revenue accountability. Separate audit mechanisms are needed to ensure transparency and alignment with government regulations.

Authors

Institutions

Publication Details

Journal
Jurnal Multidisiplin Indonesia
Published
2024-12-31
DOI
https://doi.org/10.58344/jmi.v3i12.2115
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Financial Feasibility Study for The Construction of The Pulo Gebang–Joglo Light Rail Transit (LRT) Project

Rudy Hermawan Karsaman, Harun Al Rasyid Lubis, Adi Ariyanti
Jurnal Multidisiplin Indonesia
Occupational Health and Safety Management
article

Financial Feasibility Study for The Construction of The Pulo Gebang–Joglo Light Rail Transit (LRT) Project

Rudy Hermawan Karsaman, Harun Al Rasyid Lubis, Adi Ariyanti
article en

Abstract

The DKI Jakarta Regional Government is evaluating a rail Public-Private Partnership (PPP) proposal for the Pulo Gebang-Joglo Light Rail Transit (LRT) under the Unsolicited Local Government and Business Entity Cooperation (KPDBU) scheme. This thesis examines the project's feasibility, focusing on financial and risk aspects. The proposal is currently under review by the DKI Jakarta Provincial Government. Passenger forecasts include pessimistic, moderate, and optimistic scenarios to estimate potential revenue. Investment costs (capex) and service revenue are calculated for a 30-year concession period. A financial feasibility study, assuming 4% inflation and a 9.15% benchmark interest rate, utilizes Net Present Value (NPV), Internal Rate of Return (IRR), Profitability Index (PI), and payback period metrics. The project is deemed financially viable under the Availability Payment (AP) scheme, yielding an NPV of Rp14.23 trillion, an IRR of 11.77%, and a PI of 1.035. The payback period is projected at twelve years, with annual AP payments of Rp1.94 trillion over the concession period. Risk analysis identified 16 risks across six categories, with 44% classified as very high, 38% high, and 19% medium. Financial aspects based on VAT Regulation No. 2 of 2020 scored 52.5%, the PPP aspect 41.7%, and government support/government guarantees 50%. Despite its financial feasibility, the unsolicited KPDBU proposal requires further refinement, particularly regarding AP financing and tariff revenue accountability. Separate audit mechanisms are needed to ensure transparency and alignment with government regulations.

Jurnal Multidisiplin IndonesiaVol. 3(12)
Bandung Institute of Technology (ID)
Openalex Percentile: Top 52%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Financial Feasibility Study for The Construction of The Pulo Gebang–Joglo Light Rail Transit (LRT) Project — Rudy Hermawan Karsaman, Harun Al Rasyid Lubis, et al. · Jurnal Multidisiplin Indonesia (2024) | TGRS Research Map | TGRS