Feasibility Analysis of Roof PLTS Development For Electricity Fulfillment at Station

Lemah Abang Station is a station located in Cikarang, this station is used for Cikarang-Cikampek, Cikarang-Purwakarta trips and KRL trips. To support the general national energy plan (RUEN) through Presidential Regulation No.79 of 2014, the Government of Indonesia has set a policy of increasing the share of renewable energy in the national energy mix to 23% by 2025. To support this effort, PLN's electrical power is converted to solar panels. This can be seen from the abundant solar energy potential in Cikarang, namely 5,040 Kwh/m2/day with a total duration of 2-9 hours of solar radiation per day. The solar panels that will be made have a capacity of 20 kWp using 48 units of 450Wp solar panels. Other components needed are a 20 kW inverter, 8 12V 200Ah batteries, kWh Exim, Solar Charger. Based on the economic analysis, the cheapest energy cost is 1762/kWh. In addition, the investment analysis for the construction of solar panels with the NPV, IRR, PI, and DPP methods is declared feasible to be carried out.

Authors

Institutions

Publication Details

Journal
SAINSTECH NUSANTARA
Published
2024-08-30
DOI
https://doi.org/10.71225/jstn.v1i3.69
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Feasibility Analysis of Roof PLTS Development For Electricity Fulfillment at Station

Natriya Faisal Rachman, Cahya Firdhous
SAINSTECH NUSANTARA
Power Systems and Technologies
article

Feasibility Analysis of Roof PLTS Development For Electricity Fulfillment at Station

Natriya Faisal Rachman, Cahya Firdhous
article en

Abstract

Lemah Abang Station is a station located in Cikarang, this station is used for Cikarang-Cikampek, Cikarang-Purwakarta trips and KRL trips. To support the general national energy plan (RUEN) through Presidential Regulation No.79 of 2014, the Government of Indonesia has set a policy of increasing the share of renewable energy in the national energy mix to 23% by 2025. To support this effort, PLN's electrical power is converted to solar panels. This can be seen from the abundant solar energy potential in Cikarang, namely 5,040 Kwh/m2/day with a total duration of 2-9 hours of solar radiation per day. The solar panels that will be made have a capacity of 20 kWp using 48 units of 450Wp solar panels. Other components needed are a 20 kW inverter, 8 12V 200Ah batteries, kWh Exim, Solar Charger. Based on the economic analysis, the cheapest energy cost is 1762/kWh. In addition, the investment analysis for the construction of solar panels with the NPV, IRR, PI, and DPP methods is declared feasible to be carried out.

SAINSTECH NUSANTARAVol. 1(3)
Institut Sains dan Teknologi Terpadu Surabaya (ID)
Openalex Percentile: Top 74%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.