Determining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis

This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-02-20
DOI
https://doi.org/10.3390/app15052258
Citations
3
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
2.86

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis

Q. Li, Yuanzhuo Li, Zhongsheng Tan, Linfeng Li et al.
3 citations
Applied Sciences
Tunneling and Rock Mechanics
2.86
article

Determining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis

Q. Li, Yuanzhuo Li, Zhongsheng Tan, Linfeng Li, Baojin Zhang
article en
3 citations

Abstract

This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.

Applied SciencesVol. 15(5)
Beijing Jiaotong University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 12%
Tunneling and Rock Mechanics
2.86
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.