MODERN METHODOLOGICAL PROBLEMS OF ESTIMATING THE WATER BALANCE OF THE SIVASH BAY (THE SEA OF AZOV) AND WAYS TO SOLVE THEM

The potential of using modern methods of numerical simulation and remote sensing for calculating some of the water balance components of the Sivash Bay under the conditions of modern climate change and lack of in situ data from the Genichesk and Chongar Bridge hydrometeorological stations are discussed. The results of calculating the level of the Sivash Bay using modern numerical simulation methods are presented to estimate such water balance components of the bay as the water exchange with the Sea of Azov through the Tonkii Strait. In the paper, there are also some examples of monitoring the water surface area changes in the Sivash Bay and the Sivash reservoirs, the data on which are necessary for water balance calculations using remote methods. The problems in calculating the evaporation from the bay surface as one of the main output components of the bay water balance under conditions of increasing salinity in the bay are considered.

Authors

Publication Details

Journal
Meteorologiya i Gidrologiya
Published
2024-11-01
DOI
https://doi.org/10.52002/0130-2906-2024-11-97-107
Primary Topic
Aquatic and Environmental Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

MODERN METHODOLOGICAL PROBLEMS OF ESTIMATING THE WATER BALANCE OF THE SIVASH BAY (THE SEA OF AZOV) AND WAYS TO SOLVE THEM

Е. S. Eremina, E. E. Sovga, T. V. Khmara, V. P. Evstigneev
1 links
Meteorologiya i Gidrologiya
Aquatic and Environmental Studies
article

MODERN METHODOLOGICAL PROBLEMS OF ESTIMATING THE WATER BALANCE OF THE SIVASH BAY (THE SEA OF AZOV) AND WAYS TO SOLVE THEM

Е. S. Eremina, E. E. Sovga, T. V. Khmara, V. P. Evstigneev
article en

Abstract

The potential of using modern methods of numerical simulation and remote sensing for calculating some of the water balance components of the Sivash Bay under the conditions of modern climate change and lack of in situ data from the Genichesk and Chongar Bridge hydrometeorological stations are discussed. The results of calculating the level of the Sivash Bay using modern numerical simulation methods are presented to estimate such water balance components of the bay as the water exchange with the Sea of Azov through the Tonkii Strait. In the paper, there are also some examples of monitoring the water surface area changes in the Sivash Bay and the Sivash reservoirs, the data on which are necessary for water balance calculations using remote methods. The problems in calculating the evaporation from the bay surface as one of the main output components of the bay water balance under conditions of increasing salinity in the bay are considered.

Meteorologiya i Gidrologiya(11)
Openalex Percentile: Top 71%
Aquatic and Environmental Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.