Application of the Single-Order Model to Minimize Capital Costs and Project Delays: A Case Study for High-Value Inventories in Construction Projects

This paper presents an optimization model for managing costly inventories, specifically high-voltage transformers, in electrical construction projects, aimed at minimizing capital costs and project delays. The study applies the single-period inventory model, also known as the Newsvendor model, to determine the optimal order quantity at the project's start. Sensitivity analysis is performed on several parameters to assess the impact of each attribute on the optimal order quantity. The results show that lower success probabilities and higher under-ordering costs require larger order quantities to avoid shortages. Higher scrap values also increase the optimal orders, especially when unit costs are low. These findings highlight the importance of a flexible inventory strategy tailored to project-specific factors. The paper provides construction project managers with strategies to optimize inventory management, reducing costly delays and overruns. By applying the Newsvendor model, it supports better decision-making when ordering high-value components, such as high-voltage transformers, ensuring efficient project execution.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.1109/ictmod63116.2024.10878201
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of the Single-Order Model to Minimize Capital Costs and Project Delays: A Case Study for High-Value Inventories in Construction Projects

Andrei Sleptchenko, Saed Amer, Mahmoud Allam
Construction Project Management and Performance
article

Application of the Single-Order Model to Minimize Capital Costs and Project Delays: A Case Study for High-Value Inventories in Construction Projects

Andrei Sleptchenko, Saed Amer, Mahmoud Allam
article en

Abstract

This paper presents an optimization model for managing costly inventories, specifically high-voltage transformers, in electrical construction projects, aimed at minimizing capital costs and project delays. The study applies the single-period inventory model, also known as the Newsvendor model, to determine the optimal order quantity at the project's start. Sensitivity analysis is performed on several parameters to assess the impact of each attribute on the optimal order quantity. The results show that lower success probabilities and higher under-ordering costs require larger order quantities to avoid shortages. Higher scrap values also increase the optimal orders, especially when unit costs are low. These findings highlight the importance of a flexible inventory strategy tailored to project-specific factors. The paper provides construction project managers with strategies to optimize inventory management, reducing costly delays and overruns. By applying the Newsvendor model, it supports better decision-making when ordering high-value components, such as high-voltage transformers, ensuring efficient project execution.

Khalifa University of Science and Technology (AE)
Industry, innovation and infrastructure
Openalex Percentile: Top 67%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Application of the Single-Order Model to Minimize Capital Costs and Project Delays: A Case Study for High-Value Inventories in Construction Projects — Andrei Sleptchenko, Saed Amer, et al. · (2024) | TGRS Research Map | TGRS