Time Study Based Model to Optimize the Assembly Line Efficiency and Labor Cost Incorporating Human Factors

Human factors play an important role in the optimization of industrial processes. Factors such as a worker's skill, effort, condition, and consistency have a significant impact on his performance. The objective of this paper is to determine the effect of human factors on the efficiency of assembly lines and labor costs by using the Classical Westinghouse Method (CWM). Using a time study-based mathematical model, the efficiency of the assembly lines and labor costs are optimized by considering human factors such as workers' skill, effort, condition, and consistency. The model is validated by a time study of the serial manufacturing industry in Pakistan. In a nutshell, this model may enable the serial assembly line manufacturing industries to improve efficiency and optimize labor costs by taking human factors into account.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.1109/ictmod63116.2024.10878176
Citations
1
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Time Study Based Model to Optimize the Assembly Line Efficiency and Labor Cost Incorporating Human Factors

Ratna Saha, Zunaira Sajjad, Afshan Naseem, Ali Ahsan et al.
1 citations
Assembly Line Balancing Optimization
0.35
article

Time Study Based Model to Optimize the Assembly Line Efficiency and Labor Cost Incorporating Human Factors

Ratna Saha, Zunaira Sajjad, Afshan Naseem, Ali Ahsan, Muhammad Imran Akbar
article en
1 citations

Abstract

Human factors play an important role in the optimization of industrial processes. Factors such as a worker's skill, effort, condition, and consistency have a significant impact on his performance. The objective of this paper is to determine the effect of human factors on the efficiency of assembly lines and labor costs by using the Classical Westinghouse Method (CWM). Using a time study-based mathematical model, the efficiency of the assembly lines and labor costs are optimized by considering human factors such as workers' skill, effort, condition, and consistency. The model is validated by a time study of the serial manufacturing industry in Pakistan. In a nutshell, this model may enable the serial assembly line manufacturing industries to improve efficiency and optimize labor costs by taking human factors into account.

Torrens University Australia (AU), National University of Sciences and Technology (PK)
Decent work and economic growth
Openalex Percentile: Top 31%
Assembly Line Balancing Optimization
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Time Study Based Model to Optimize the Assembly Line Efficiency and Labor Cost Incorporating Human Factors — Ratna Saha, Zunaira Sajjad, et al. · (2024) | TGRS Research Map | TGRS