Mine Planning for Overburden Target Achievement in First Quarter of 2024 at Pit 3 PT Bina Sarana Sukses PT Tanjung Alam Jaya Jobsite Banjar, South Kalimantan

Abstract PT Tanjung Alam Jaya plans to mine Seam A, Seam B, and Seam C in Pit 3 in near future which has dense vegetation and thick overburden material with a dip of 23°-25°. The steep slope of the coal seam results in a high Stripping Ratio (SR). The study was conducted using quantitative method with primary data collection through field observation and secondary data from PT Bina Sarana Sukses and other sources. The data is processed and analyzed to determine the best mine plan design. The mining direction for the first quarter of 2024 will start from the north area and widen to the south, following the strike of the coal seam. The design for the first quarter of 2024 Pit 3 is divided into three monthly sequence designs with a total overburden capacity of 2,264,048.21 BCM and 103,555.4 tons of coal, with an SR of 21.86 in accordance with the provisions of 115% of the production capacity of the determined by the company. The current study concludes the need of loaders and haulers, with a total of 3 loaders and 14 haulers for overburden removal target ranged from 621,160.89 BCM to 685,537.27 BCM for three monthly sequences.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2025-02-01
DOI
https://doi.org/10.1088/1755-1315/1451/1/012030
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mine Planning for Overburden Target Achievement in First Quarter of 2024 at Pit 3 PT Bina Sarana Sukses PT Tanjung Alam Jaya Jobsite Banjar, South Kalimantan

Mesias Citra Dewi, A Thomas William, Dian Eka Aryanti, Novan Bagaskara
IOP Conference Series Earth and Environmental Science
Mining Techniques and Economics
article

Mine Planning for Overburden Target Achievement in First Quarter of 2024 at Pit 3 PT Bina Sarana Sukses PT Tanjung Alam Jaya Jobsite Banjar, South Kalimantan

Mesias Citra Dewi, A Thomas William, Dian Eka Aryanti, Novan Bagaskara
article en

Abstract

Abstract PT Tanjung Alam Jaya plans to mine Seam A, Seam B, and Seam C in Pit 3 in near future which has dense vegetation and thick overburden material with a dip of 23°-25°. The steep slope of the coal seam results in a high Stripping Ratio (SR). The study was conducted using quantitative method with primary data collection through field observation and secondary data from PT Bina Sarana Sukses and other sources. The data is processed and analyzed to determine the best mine plan design. The mining direction for the first quarter of 2024 will start from the north area and widen to the south, following the strike of the coal seam. The design for the first quarter of 2024 Pit 3 is divided into three monthly sequence designs with a total overburden capacity of 2,264,048.21 BCM and 103,555.4 tons of coal, with an SR of 21.86 in accordance with the provisions of 115% of the production capacity of the determined by the company. The current study concludes the need of loaders and haulers, with a total of 3 loaders and 14 haulers for overburden removal target ranged from 621,160.89 BCM to 685,537.27 BCM for three monthly sequences.

IOP Conference Series Earth and Environmental ScienceVol. 1451(1)
Bandung Institute of Technology (ID), Universitas Informatika dan Bisnis Indonesia (ID)
Openalex Percentile: Top 93%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.