PERBANDINGAN KEBUTUHAN BESI DAN BIAYA MENGGUNAKAN METODE BAR BENDING SCHEDULE (BBS) PADA PROYEK RENOVASI RUMAH TINGGAL

In a construction project, good planning is needed to support the success of the project. One of them is project cost planning. Material is the biggest determinant with a percentage of 50-70% of project cost requirements. Therefore, it is necessary to plan for optimal and accurate material requirements, especially to reduce waste or waste due to the material. The bar bending schedule (BBS) method is an accurate method of calculating material requirements because it pays attention to the cut pattern and length according to the existing working drawings. In this study, a comparison is made of the results of existing calculations based on field data with the BBS method related to the quantity of iron material requirements and the remaining material which then refers to the amount of material costs. That way, it can be seen the amount of correction of the quantity of iron material using the BBS method. Based on the calculation results, it shows that the quantity of iron material is 14.31% less and the remaining material is 1.18% less than the previous calculation results based on field data with the remaining material. This affects the total cost of materials issued from the previous Rp.59,941,200 to Rp.55,987,870 which means it can reduce project costs by Rp.3,953,330. Abstrak Pada suatu proyek konstruksi perlu adanya perencanaan yang baik untuk menunnjang keberhasilan proyek tersebut. Salah satunya adalah perencanaan biaya proyek. Material menjadi penentu paling besar dengan persentase 50-70% dari kebutuhan biaya proyek. Oleh karena itu, perlu adanya perencanaan kebutuhan material yang optimal dan akurat, terlebih untuk mengurangi pemborosan atau waste akibat material tersbut. Metode bar bending schedule (BBS) merupakan metode perhitungan kebutuhan material yang akurat sebab memperhatikan pola potongan dan ukuran panajng sesuai dengan gambar kerja yang ada. Pada penelitian ini, dilakukan perbandingan akan hasil perhitungan yang sudah ada berdasarkan data lapangan dengan metode BBS terkait kuantitas kebutuhan material besi dan sisa material yang kemudian mengacu pada besarnya biaya material. Dengan begitu, dapat terlihat besarnya koreksi kuantitas material besi dengan menggunakan metode BBS. Berdasarkan hasil perhitungan, menunjukan bahwa kuantitas material besi 14,31% lebih sedikit dan sisa material 1,18% lebih sedikit dibandingkan dengan hasil perhitungan sebelumnya berdasarkan data lapangan dengan sisa material. Hal ini mempengaruhi biaya total material yang dikeluarkan dari yang sebelumnya Rp.59.941.200 menjadi Rp.55.987.870 yang berarti mampu mengurangi biaya proyek hingga Rp.3.953.330.

Authors

Institutions

Publication Details

Journal
JMTS Jurnal Mitra Teknik Sipil
Published
2025-02-18
DOI
https://doi.org/10.24912/jmts.v8i1.33134
Citations
1
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
5.77
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERBANDINGAN KEBUTUHAN BESI DAN BIAYA MENGGUNAKAN METODE BAR BENDING SCHEDULE (BBS) PADA PROYEK RENOVASI RUMAH TINGGAL

Vania Yori Wakano, Arif Sandjaya
1 citations
JMTS Jurnal Mitra Teknik Sipil
Occupational Health and Safety Management
5.77
article

PERBANDINGAN KEBUTUHAN BESI DAN BIAYA MENGGUNAKAN METODE BAR BENDING SCHEDULE (BBS) PADA PROYEK RENOVASI RUMAH TINGGAL

Vania Yori Wakano, Arif Sandjaya
article en
1 citations

Abstract

In a construction project, good planning is needed to support the success of the project. One of them is project cost planning. Material is the biggest determinant with a percentage of 50-70% of project cost requirements. Therefore, it is necessary to plan for optimal and accurate material requirements, especially to reduce waste or waste due to the material. The bar bending schedule (BBS) method is an accurate method of calculating material requirements because it pays attention to the cut pattern and length according to the existing working drawings. In this study, a comparison is made of the results of existing calculations based on field data with the BBS method related to the quantity of iron material requirements and the remaining material which then refers to the amount of material costs. That way, it can be seen the amount of correction of the quantity of iron material using the BBS method. Based on the calculation results, it shows that the quantity of iron material is 14.31% less and the remaining material is 1.18% less than the previous calculation results based on field data with the remaining material. This affects the total cost of materials issued from the previous Rp.59,941,200 to Rp.55,987,870 which means it can reduce project costs by Rp.3,953,330. Abstrak Pada suatu proyek konstruksi perlu adanya perencanaan yang baik untuk menunnjang keberhasilan proyek tersebut. Salah satunya adalah perencanaan biaya proyek. Material menjadi penentu paling besar dengan persentase 50-70% dari kebutuhan biaya proyek. Oleh karena itu, perlu adanya perencanaan kebutuhan material yang optimal dan akurat, terlebih untuk mengurangi pemborosan atau waste akibat material tersbut. Metode bar bending schedule (BBS) merupakan metode perhitungan kebutuhan material yang akurat sebab memperhatikan pola potongan dan ukuran panajng sesuai dengan gambar kerja yang ada. Pada penelitian ini, dilakukan perbandingan akan hasil perhitungan yang sudah ada berdasarkan data lapangan dengan metode BBS terkait kuantitas kebutuhan material besi dan sisa material yang kemudian mengacu pada besarnya biaya material. Dengan begitu, dapat terlihat besarnya koreksi kuantitas material besi dengan menggunakan metode BBS. Berdasarkan hasil perhitungan, menunjukan bahwa kuantitas material besi 14,31% lebih sedikit dan sisa material 1,18% lebih sedikit dibandingkan dengan hasil perhitungan sebelumnya berdasarkan data lapangan dengan sisa material. Hal ini mempengaruhi biaya total material yang dikeluarkan dari yang sebelumnya Rp.59.941.200 menjadi Rp.55.987.870 yang berarti mampu mengurangi biaya proyek hingga Rp.3.953.330.

JMTS Jurnal Mitra Teknik Sipil
Tarumanagara University (ID)
Openalex Percentile: Top 8%
Occupational Health and Safety Management
5.77
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.