1,000 HP Rig for Indonesia Geothermal Drilling

Abstract Rig rental and service cost accounts for 40-45% of the drilling cost – the largest drilling cost component. Choosing the right rig size will potentially reduce well costs – enhancing a geothermal project’s overall economic value. Despite rig manufacturers providing maximum rated drilling depth capabilities, drilling team often opt for larger than necessary rig sizes based on past experiences. Statistical data for geothermal drilling in Indonesia with depths between 1,200-3,280 mMD indicates common usage of 1,500-2,000 HP rigs, which was found to be excessive. The study in this paper shows that a 1,000 HP rig is sufficient to drill a geothermal well in Indonesia down to 3,300 mMD. This will potentially enable significant drilling cost savings of around USD 25,000/day.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2025-02-01
DOI
https://doi.org/10.1088/1755-1315/1456/1/012004
Primary Topic
Electric Power Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

1,000 HP Rig for Indonesia Geothermal Drilling

Ashadi Ashadi, Rohan Chandra, Yudi Hartono, Redha Bhawika Putra et al.
IOP Conference Series Earth and Environmental Science
Electric Power Systems and Control
article

1,000 HP Rig for Indonesia Geothermal Drilling

Ashadi Ashadi, Rohan Chandra, Yudi Hartono, Redha Bhawika Putra, Charlotte Tiffany Mandagi, Sahat Sae Simangunsong, Abilati Monikha Wulandari, Sentanu Wisnuwardhana Reksalegora, Subur Arianto
article en

Abstract

Abstract Rig rental and service cost accounts for 40-45% of the drilling cost – the largest drilling cost component. Choosing the right rig size will potentially reduce well costs – enhancing a geothermal project’s overall economic value. Despite rig manufacturers providing maximum rated drilling depth capabilities, drilling team often opt for larger than necessary rig sizes based on past experiences. Statistical data for geothermal drilling in Indonesia with depths between 1,200-3,280 mMD indicates common usage of 1,500-2,000 HP rigs, which was found to be excessive. The study in this paper shows that a 1,000 HP rig is sufficient to drill a geothermal well in Indonesia down to 3,300 mMD. This will potentially enable significant drilling cost savings of around USD 25,000/day.

IOP Conference Series Earth and Environmental ScienceVol. 1456(1)
Indonesian Pediatric Society (ID), Ministry of Energy (IL)
Openalex Percentile: Top 96%
Electric Power Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.