Abstract The study examined the non-productive time (NPT) of drilling activities on rigs X, Y, and Z in field A. It utilized the pareto chart approach to identify the specific type of NPT that was the primary issue during the drilling operation. Moreover, seeking methods to rectify and enhance the efficiency of X, Y, and Z rigs in carrying out drilling operations. According to the conducted research, the operational performance of rigs X, Y, and Z may be characterized by their work performance percentages, which are 90%, 92%, and 85% respectively, in completing drilling activities. The primary factors contributing to non-productive time (NPT) on rig X are rig maintenance and drilling issues, while rigs Y and Z experience NPT due to maintenance activities and unforeseen circumstances. To classify the NPT repair rig, it is necessary to perform preventative maintenance, inspect vital components, and replace any spare parts with authentic replacements. Unmanageable categorization involving the installation of matting boards near wellpads and the incorporation of mobile fleets. To effectively categorize NPT hole issues, it is necessary to optimize the rate of penetration (ROP), ensure the mud filters are not excessively thick, and prioritize thorough hole cleaning.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-02-01
DOI
https://doi.org/10.1088/1742-6596/2942/1/012007
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Mitigation: Evaluation of Rig X, Rig Y, and Rig Z Performance by Analyzing Non-Productive Time on Drilling Activities in Field “A”

Muhammad Ariyon, D R Hilmy
Journal of Physics Conference Series
Drilling and Well Engineering
article

Risk Mitigation: Evaluation of Rig X, Rig Y, and Rig Z Performance by Analyzing Non-Productive Time on Drilling Activities in Field “A”

Muhammad Ariyon, D R Hilmy
article en

Abstract

Abstract The study examined the non-productive time (NPT) of drilling activities on rigs X, Y, and Z in field A. It utilized the pareto chart approach to identify the specific type of NPT that was the primary issue during the drilling operation. Moreover, seeking methods to rectify and enhance the efficiency of X, Y, and Z rigs in carrying out drilling operations. According to the conducted research, the operational performance of rigs X, Y, and Z may be characterized by their work performance percentages, which are 90%, 92%, and 85% respectively, in completing drilling activities. The primary factors contributing to non-productive time (NPT) on rig X are rig maintenance and drilling issues, while rigs Y and Z experience NPT due to maintenance activities and unforeseen circumstances. To classify the NPT repair rig, it is necessary to perform preventative maintenance, inspect vital components, and replace any spare parts with authentic replacements. Unmanageable categorization involving the installation of matting boards near wellpads and the incorporation of mobile fleets. To effectively categorize NPT hole issues, it is necessary to optimize the rate of penetration (ROP), ensure the mud filters are not excessively thick, and prioritize thorough hole cleaning.

Journal of Physics Conference SeriesVol. 2942(1)
Islamic University of Riau (ID)
Openalex Percentile: Top 96%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Mitigation: Evaluation of Rig X, Rig Y, and Rig Z Performance by Analyzing Non-Productive Time on Drilling Activities in Field “A” — Muhammad Ariyon, D R Hilmy · Journal of Physics Conference Series (2025) | TGRS Research Map | TGRS