Feasibility study of a wind power plant for East Kalimantan

Abstract According to the National Energy General Plan (RUEN) 2017 and National Energy Policy (KEN) 2014 issued by the National Energy Government, the use of Variable Renewable Energy (VRE) is expected to reach 31% by 2030. However, until 2019 the renewable energy mix in national energy only reached 9.1%. Even though the wind potential in East Kalimantan or East Borneo can be exploited by considering the supply of the wind using the Wind Turbine Generation and helping to fulfil the electricity needs. Based on the feasibility study, the development was obtained at IDR 17,056 billion per year over 25 years of operation. Meanwhile, the payback period is achieved for around 6.4 years of operation making the project feasible to be implemented. This project is based on the needs of one household that consumed around 5,116 Watt for everyday electricity consumption.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-02-01
DOI
https://doi.org/10.1088/1742-6596/2942/1/012008
Primary Topic
Wind Energy Research and Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Feasibility study of a wind power plant for East Kalimantan

Bandiyah Sri Aprillia, Marsha Clarabell
Journal of Physics Conference Series
Wind Energy Research and Development
article

Feasibility study of a wind power plant for East Kalimantan

Bandiyah Sri Aprillia, Marsha Clarabell
article en

Abstract

Abstract According to the National Energy General Plan (RUEN) 2017 and National Energy Policy (KEN) 2014 issued by the National Energy Government, the use of Variable Renewable Energy (VRE) is expected to reach 31% by 2030. However, until 2019 the renewable energy mix in national energy only reached 9.1%. Even though the wind potential in East Kalimantan or East Borneo can be exploited by considering the supply of the wind using the Wind Turbine Generation and helping to fulfil the electricity needs. Based on the feasibility study, the development was obtained at IDR 17,056 billion per year over 25 years of operation. Meanwhile, the payback period is achieved for around 6.4 years of operation making the project feasible to be implemented. This project is based on the needs of one household that consumed around 5,116 Watt for everyday electricity consumption.

Journal of Physics Conference SeriesVol. 2942(1)
Telkom University (ID)
Openalex Percentile: Top 96%
Wind Energy Research and Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Feasibility study of a wind power plant for East Kalimantan — Bandiyah Sri Aprillia, Marsha Clarabell · Journal of Physics Conference Series (2025) | TGRS Research Map | TGRS