Denormalized Database of HUST-PTF Beamline Control System

Huazhong University of Science and Technology is developing a proton therapy facility (HUST-PTF) based on a superconducting cyclotron. To achieve the scheduling and control of various underlying devices in the beamline during beam transport, we designed a beamline control system (BCS) with distributed architecture based on OPC UA. Initially, we developed the Beam Control System (BCS) and built the control parts for underlying hardware, such as magnet power supply, degrader and beam diagnostics. However, due to the lack of beam database, we are unable to read and store data from the underlying hardware during beam commissioning, making it impossible to achieve subsequent automatic configuration for beam therapy. Therefore, we further design and develop a denormalized beam database based on the actual architecture, beam commissioning, and therapy requirements of HUST-PTF. By demoralizer, we store data in as few tables as possible, reducing join operations between tables, minimizing disk I/O operations, to accelerate data query speed. We also test the performance of beam database, verifying that the denormalized beam database could meet the actual beam commissioning and therapy requirements of HUST-PTF.

Authors

Institutions

Publication Details

Published
2024-11-22
DOI
https://doi.org/10.1109/ifeea64237.2024.10878728
Primary Topic
Cybersecurity and Information Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Denormalized Database of HUST-PTF Beamline Control System

Chengyong Liu, Li Dong, Bin Qin
Cybersecurity and Information Systems
article

Denormalized Database of HUST-PTF Beamline Control System

Chengyong Liu, Li Dong, Bin Qin
article en

Abstract

Huazhong University of Science and Technology is developing a proton therapy facility (HUST-PTF) based on a superconducting cyclotron. To achieve the scheduling and control of various underlying devices in the beamline during beam transport, we designed a beamline control system (BCS) with distributed architecture based on OPC UA. Initially, we developed the Beam Control System (BCS) and built the control parts for underlying hardware, such as magnet power supply, degrader and beam diagnostics. However, due to the lack of beam database, we are unable to read and store data from the underlying hardware during beam commissioning, making it impossible to achieve subsequent automatic configuration for beam therapy. Therefore, we further design and develop a denormalized beam database based on the actual architecture, beam commissioning, and therapy requirements of HUST-PTF. By demoralizer, we store data in as few tables as possible, reducing join operations between tables, minimizing disk I/O operations, to accelerate data query speed. We also test the performance of beam database, verifying that the denormalized beam database could meet the actual beam commissioning and therapy requirements of HUST-PTF.

Huazhong University of Science and Technology (CN)
National Natural Science Foundation of China
Affordable and clean energy
Openalex Percentile: Top 68%
Cybersecurity and Information Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.