Simulated Calculation and Measured Analysis on the Spot with the 750 kV Transformer Switch-In with Load

Through an example of a main transformer switch-in with load during the reverse transmission of a 750 kV power plan, the paper introduces the basic principle of transformer switch-in with load. EMTPE program that is used to establish a calculation model, at the same time mainly considers the excitation characteristics of the transformer, the transient model of the circuit breaker, and the model of high voltage transformer, and calculated the inrush current with transformer switch-in with load in this plan. During system debugging in the plan, the two sets of main transformers passed the closing and opening test, and the data of inrush current in the test are recorded and analyzed. The simulation calculation and measured data show that the results are consistent. The simulation calculation also shows that it is not recommended to perform on-load closing of the transformer except for special circumstances, because of the influence of hysteresis characteristic when the transformer was switched in with load or the terminal voltage of the transformer resumed normal level from a low one after an external near-end fault was cleared, which various transformer differential protection using the characteristics of inrush to implement block scheme may mal-operate.

Authors

Institutions

Publication Details

Journal
Journal of Electronic Research and Application
Published
2025-02-12
DOI
https://doi.org/10.26689/jera.v9i1.9424
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulated Calculation and Measured Analysis on the Spot with the 750 kV Transformer Switch-In with Load

Bing Sun, Licheng Zhang, Shan Li
Journal of Electronic Research and Application
Smart Grid and Power Systems
article

Simulated Calculation and Measured Analysis on the Spot with the 750 kV Transformer Switch-In with Load

Bing Sun, Licheng Zhang, Shan Li
article en

Abstract

Through an example of a main transformer switch-in with load during the reverse transmission of a 750 kV power plan, the paper introduces the basic principle of transformer switch-in with load. EMTPE program that is used to establish a calculation model, at the same time mainly considers the excitation characteristics of the transformer, the transient model of the circuit breaker, and the model of high voltage transformer, and calculated the inrush current with transformer switch-in with load in this plan. During system debugging in the plan, the two sets of main transformers passed the closing and opening test, and the data of inrush current in the test are recorded and analyzed. The simulation calculation and measured data show that the results are consistent. The simulation calculation also shows that it is not recommended to perform on-load closing of the transformer except for special circumstances, because of the influence of hysteresis characteristic when the transformer was switched in with load or the terminal voltage of the transformer resumed normal level from a low one after an external near-end fault was cleared, which various transformer differential protection using the characteristics of inrush to implement block scheme may mal-operate.

Journal of Electronic Research and ApplicationVol. 9(1)
Xinjiang New Energy Research Institute (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 98%
Smart Grid and Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.