PERANCANGAN PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM

This research discusses the design of Solar Power Plant (PLTS) as a power supply for Temega water pump Perumda Tirta Tohlangkir Karangasem District, Bali. The Temega waterpump currently uses 11 kW of electrical power with high operational costs so that the PLTS isdesigned to reduce dependence on PLN electricity and reduce operational costs. This researchfocuses on the results of simulation analysis of scenarios 1, 2, and 3 using PVSyst software.Simulation scenario 1 uses 48 solar modules (16 in series and 3 in parallel) to meet the dailyenergy demand of 26.64 kWp pump. Scenario 2 simulation uses 30 solar modules (15 in seriesand 2 in parallel) to meet the daily energy demand of 16.65 kWp pumps. Simulation scenario 3uses 26 solar modules (13 in series and 2 in parallel) to meet the daily energy needs of the pumpof 14.43 kWp. The results show that scenario one simulation produces the highest energy butcauses an energy surplus, while scenarios two and three are more efficient in minimizing wastedenergy, which is 0 kWh/year.

Authors

Publication Details

Journal
Jurnal SPEKTRUM
Published
2024-12-31
DOI
https://doi.org/10.24843/spektrum.2024.v11.i04.p10
Primary Topic
Engineering and Technology Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERANCANGAN PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM

I Wayan Sukerayasa, I Nyoman Setiawan, I Komang Bagus Andriantara
Jurnal SPEKTRUM
Engineering and Technology Innovations
article

PERANCANGAN PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM

I Wayan Sukerayasa, I Nyoman Setiawan, I Komang Bagus Andriantara
article en

Abstract

This research discusses the design of Solar Power Plant (PLTS) as a power supply for Temega water pump Perumda Tirta Tohlangkir Karangasem District, Bali. The Temega waterpump currently uses 11 kW of electrical power with high operational costs so that the PLTS isdesigned to reduce dependence on PLN electricity and reduce operational costs. This researchfocuses on the results of simulation analysis of scenarios 1, 2, and 3 using PVSyst software.Simulation scenario 1 uses 48 solar modules (16 in series and 3 in parallel) to meet the dailyenergy demand of 26.64 kWp pump. Scenario 2 simulation uses 30 solar modules (15 in seriesand 2 in parallel) to meet the daily energy demand of 16.65 kWp pumps. Simulation scenario 3uses 26 solar modules (13 in series and 2 in parallel) to meet the daily energy needs of the pumpof 14.43 kWp. The results show that scenario one simulation produces the highest energy butcauses an energy surplus, while scenarios two and three are more efficient in minimizing wastedenergy, which is 0 kWh/year.

Jurnal SPEKTRUMVol. 11(4)
Openalex Percentile: Top 75%
Engineering and Technology Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.