ANALISIS INVESTASI PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM

Solar Power is a power generation tools modifier sunlight into electrical energy with various benefits for life. This research aims to analyze the investment of PLTS as a power supplyfor Temega water pump Perumda Tirta Tohlangkir, Karangasem District. In the investmentanalysis, this capstone project uses three indicators of investment feasibility in each scenario,including Net Present Value (NPV), Profitability Index (PI) also Payback Period (PP). A projectstated to be worthy if the NPV value is more than 0 (>0), the PI value is more than 1 (>1), and thePP value is smaller than the project age (25 years). It can be concluded that the design of PLTSTemega Water Pump Perumda Tirta Tohlangkir Karangasem District scenarios 1, 2, and 3 aredeclared feasible to implement because they have met the three criteria for economic investmentfeasibility.

Authors

Publication Details

Journal
Jurnal SPEKTRUM
Published
2024-12-31
DOI
https://doi.org/10.24843/spektrum.2024.v11.i04.p8
Primary Topic
Engineering and Technology Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS INVESTASI PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM

I Wayan Sukerayasa, I Nyoman Setiawan, I Gede Ferdi Pratama
Jurnal SPEKTRUM
Engineering and Technology Innovations
article

ANALISIS INVESTASI PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM

I Wayan Sukerayasa, I Nyoman Setiawan, I Gede Ferdi Pratama
article en

Abstract

Solar Power is a power generation tools modifier sunlight into electrical energy with various benefits for life. This research aims to analyze the investment of PLTS as a power supplyfor Temega water pump Perumda Tirta Tohlangkir, Karangasem District. In the investmentanalysis, this capstone project uses three indicators of investment feasibility in each scenario,including Net Present Value (NPV), Profitability Index (PI) also Payback Period (PP). A projectstated to be worthy if the NPV value is more than 0 (>0), the PI value is more than 1 (>1), and thePP value is smaller than the project age (25 years). It can be concluded that the design of PLTSTemega Water Pump Perumda Tirta Tohlangkir Karangasem District scenarios 1, 2, and 3 aredeclared feasible to implement because they have met the three criteria for economic investmentfeasibility.

Jurnal SPEKTRUMVol. 11(4)
Openalex Percentile: Top 75%
Engineering and Technology Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.